My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CORRESPONDENCE_1997 - 2000
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
C
>
CORRAL HOLLOW
>
31130
>
4400 - Solid Waste Program
>
PR0440003
>
CORRESPONDENCE_1997 - 2000
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/12/2023 12:33:25 PM
Creation date
3/29/2021 9:53:01 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
CORRESPONDENCE
FileName_PostFix
1997 - 2000
RECORD_ID
PR0440003
PE
4434
FACILITY_ID
FA0003698
FACILITY_NAME
CORRAL HOLLOW LANDFILL
STREET_NUMBER
31130
STREET_NAME
CORRAL HOLLOW
STREET_TYPE
RD
City
TRACY
Zip
95376
APN
25303010
CURRENT_STATUS
01
SITE_LOCATION
31130 CORRAL HOLLOW RD
P_LOCATION
99
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\cfield
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
282
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
carrying landfill gas. Continued monitoring of existing groundwater monitoring wells will <br /> determine the effectiveness of the landfill gas control system. <br /> The County is in the process of hiring EMCON, consulting civil engineers,to prepare plans and <br /> specifications for the landfill gas control,system. The system will consist of a series of wells <br /> drilled to the bottom of waste, a network of pipes, condensate collection system,blowers, and <br /> enclosed flare with a condensate injection system. Vacuum will be applied to the well field with <br /> the blowers, and the collected gas will be directed into the flare to be burned. <br /> The following is a schedule of implementation for installation of the landfill gas control system: <br /> SCHEDULE OF IMPLEMENTATION <br /> TASK EST. COMPLETION DATE <br /> 1. Award Contract for design August 3, 1999 <br /> 2. Consultant completes design January 2000 <br /> 3. Complete permitting through Air District March 2000 <br /> 4. Advertise Project for bids April 2000 <br /> 5. Award bid and begin construction May 2000 <br /> 6. Finish constructionibegin operation July 2000 <br /> Upon completion of the landfill gas control system,Each individual well will be adjusted <br /> regularly to direct adequate vacuum to critical areas of gas migration. The effectiveness of the <br /> gas control system will be evaluated by performing quarterly gas probe monitoring and quarterly <br /> groundwater monitoring and comparing the results to previous reports. If landfill gas migration <br /> and VOC impact is reduced over time with operation of the landfill gas control system,the <br /> adequacy of the gas system as a corrective action measure will can be evaluated. <br /> The Regional Water Quality Control Board suggested that this work plan include a schedule for <br /> completing additional groundwater monitoring wells, as needed, sampling such wells, and <br /> reporting the results to the Board. Since leachate may not be the source of contamination,we <br /> 5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.