My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2021
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
F
>
FREMONT
>
4100
>
2300 - Underground Storage Tank Program
>
PR0231574
>
COMPLIANCE INFO_2021
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/27/2022 8:55:58 AM
Creation date
3/29/2021 11:28:00 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2021
RECORD_ID
PR0231574
PE
2361
FACILITY_ID
FA0002123
FACILITY_NAME
GREWALS GAS & LIQUOR*
STREET_NUMBER
4100
Direction
E
STREET_NAME
FREMONT
STREET_TYPE
ST
City
STOCKTON
Zip
95215
APN
14333046
CURRENT_STATUS
01
SITE_LOCATION
4100 E FREMONT ST
P_LOCATION
99
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\kblackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
38
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Appendix B <br />71 SO Overfill Valve in Tank Shut off Level Worksheet <br />Important: This is meant to be supplemental worksheet and not a substitute to following the installation <br />manual instructions. All length measurements are in inches. Please contact the Authority Having Jurisdic- <br />tion (AHJ) and review local, state, and national codes to determine the regulatory requirements governing <br />shut-off capacity in your region, as well as take into account other considerations such as extreme tank tilt. <br />Take the following measurements with the valve in- <br />stalled in the tank: <br />Distance from the 71 SO inlet tube flange to the cast <br />lug in the 71 SO body (see figures), upper tube length. <br />Note: the Upper Tube Length must be at least 16" to in- <br />clude the protective bend in the tube. <br />(D) <br />Distance from the 71 SO inlet tube flange to the top and <br />bottom of lower tube, valve length. <br />(W) = 15' ;L - <br />(U) <br />(U) = / 5'2— <br />Distance <br />Z <br />Distance from the 71 SO inlet tube flange to the bottom <br />of the tank. Note: If a tank bottom protector is present it <br />may be necessary to add this thickness to dimension <br />(OPW 6111 & 61TP models add 0.6") <br />(B) = t .rte <br />From the tank calibration chart provided by tank manu- <br />facturer find the dipstick number (Y) which corresponds <br />to the 100% volume. <br />(Y) <br />1. To determine shut-off percentage: <br />Subtract upper tube length (D) from distance to tank <br />bottom (B) � Ll <br />(X)=(B)-(D)-2"= <br />Using the tank calibration chart provided by the tank <br />manufacturer determine the tank capacity at the cal- <br />culated (X) dimension and the 100% volume (Y) tank <br />capacity. <br />(X) tank capacity in gallons = Zl I - 6 <br />(Y) tank capacity in gallons = 1410 7 Z <br />SO% = (X) capacity / (Y) capacity x100 = q 3, 6 - <br />i <br />(D) <br />Upper <br />Tube <br />(W) Valve <br />Length, <br />bottom of <br />4 <br />cut <br />�4 <br />(B) <br />To Tank <br />(Y) <br />Tank <br />r <br />(U) Valve Chart i1 <br />Length, 100% <br />top of cut Volume <br />Dipstick <br />Note: The overfill valve must be installed per AHJ require- <br />ments and all applicable local, state, and national codes. If <br />the overfill valve is set above the allowable shut-off percent- <br />age the overfill valve must be removed and replaced. For <br />reference 40 CFR part 280 Subpart B Section 280.20 overfill <br />valves should be set to a maximum of 95%. <br />21 <br />
The URL can be used to link to this page
Your browser does not support the video tag.