My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CORRESPONDENCE_2001 - 2006
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
C
>
CORRAL HOLLOW
>
31130
>
4400 - Solid Waste Program
>
PR0440003
>
CORRESPONDENCE_2001 - 2006
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/28/2024 2:40:53 PM
Creation date
3/29/2021 1:45:38 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
CORRESPONDENCE
FileName_PostFix
2001 - 2006
RECORD_ID
PR0440003
PE
4434
FACILITY_ID
FA0003698
FACILITY_NAME
CORRAL HOLLOW LANDFILL
STREET_NUMBER
31130
STREET_NAME
CORRAL HOLLOW
STREET_TYPE
RD
City
TRACY
Zip
95376
APN
25303010
CURRENT_STATUS
01
SITE_LOCATION
31130 CORRAL HOLLOW RD
P_LOCATION
99
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\cfield
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
241
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Oorral,Hollow Sanitary Landfi - 3 - 12 July 2006 <br /> ATTACHMENT <br /> REQUIREMENTS FOR <br /> MONITORING WELL INSTALLATION WORKPLANS AND <br /> MONITORING WELL INSTALLATION REPORTS <br /> Prior to installation of groundwater monitoring wells,the Discharger shall submit a workplan <br /> containing, at a minimum,the information listed in Section 1, below. Wells may be installed after staff <br /> approve the workplan. Upon installation of the monitoring wells,the Discharger shall submit a well <br /> installation report which includes the information contained in Section 2, below. All workplans and <br /> reports must be prepared under the direction of, and signed by, a registered geologist or civil engineer <br /> licensed by the State of California. <br /> SECTION 1 -Monitoring Well Installation Workplan and <br /> Groundwater Sampling and Analysis Plan <br /> The monitoring well installation workplan shall contain the following minimum information: <br /> A. General Information: <br /> Purpose of the well installation project <br /> Brief description of local geologic and hydrogeologic conditions <br /> Proposed monitoring well locations and rationale for well locations <br /> Topographic map showing facility location, roads, and surface water bodies <br /> Large scaled site map showing all existing on-site wells,proposed wells, surface drainage <br /> courses, surface water bodies,buildings,waste handling facilities,utilities, and major <br /> physical and man-made features <br /> B. Drilling Details: <br /> On-site supervision of drilling and well installation activities <br /> Description of drilling equipment and techniques <br /> Equipment decontamination procedures <br /> Soil sampling intervals(if appropriate) and logging methods <br /> C. Monitoring Well Design(in narrative and/or graphic form): <br /> Diagram of proposed well construction details <br /> - Borehole diameter <br /> - Casing and screen material, diameter, and centralizer spacing(if needed) <br /> - Type of well caps (bottom cap either screw on or secured with stainless steel screws) <br /> - Anticipated depth of well, length of well casing, and length and position of perforated <br /> interval <br /> - Thickness, position and composition of surface seal, sanitary seal, and sand pack <br /> - Anticipated screen slot size and filter pack <br /> D. Well Development (not to be performed until at least 48 hours after sanitary seal placement): <br /> Method of development to be used(i.e., surge,bail, pump, etc.) <br /> Parameters to be monitored during development and record keeping technique <br />
The URL can be used to link to this page
Your browser does not support the video tag.