Laserfiche WebLink
PHASE 2 INVESTIGATION <br /> OF EXTENT OF CLOSURE CAP <br /> AND HEALTH AND SAFETY PLAN <br /> CORRAL HOLLOW SANITARY LANDFILL <br /> PURPOSE <br /> The purpose of this work is to establish the maximum extent of the new closure cap that must be <br /> placed to ensure that all refuse at the eastern side of the Corral Hollow Landfill is beneath the <br /> closure cap. <br /> PROCEDURE <br /> The extent of the closure cap will be assessed by pot-holing to a maximum depth of four feet with <br /> either a 12-inch diameter auger or small backhoe in the area west of the drainage ditch. These pot- <br /> holes will be located in line with phase I investigation excavation Nos. 2 and 3 (Figure 2), and at <br /> other locations as necessary to locate the western limit of the closure cap sufficient to ensure that <br /> any refuse along the road which is not now covered by closure cap will be covered. Excavation of <br /> refuse will be avoided. The soil shall be separately stockpiled from refuse if encountered, and <br /> shall not be commingled. <br /> The exposed sides of the pot-holes will be inspected for the layered prescriptive cover. After <br /> inspection, the pot holes will be repaired with a 2-inch thick granular bentonite abutting the clay <br /> barrier prior to replacing the excavated soil (Figure 3). Once the extent of the present closure cap <br /> has been delineated sufficiently to define the scope of work, the closure cap will be extended with <br /> geocomposite clay liner(GCL), and the drainage ditch relocated,to prevent further percolation of <br /> rainwater through the refuse. <br /> PROPOSED CORRECTIVE ACTION <br /> It is presently contemplated that corrective action will include extending the closure cap with GCL <br /> from the determined edge of the closure cap to the edge of the road. The approach will include the <br /> placement of(GCL) as hydraulic barrier from the eastern road edge to about 5ft overlapping the <br /> determined edge of the existing closure cap (Figure 4). About 26,000 sq ft of GCL liner will be <br /> used. The GCL liner will be rolled vertically and will have edges overlapped minimum of <br /> 6 inches with bentonite powder or fine granular between the overlap (Figure 5). <br /> Geocom osite Clay Liner Specifications <br /> GCL Model Bentofix Thermal Lock NWL orequivalent <br /> Bentonite content minimum 0.84 Ib/ft at 12% moisture <br /> Grab Strength (minimum)- 150 Ib average. roll value <br /> Permeability maximum 5x10" cm/sec <br /> Health and Safety Plan Solid Waste/Public Works <br /> Corral Hollow Sanitary Landfill Page 1 of 4 San Joaquin County October 25,2006 <br />