Laserfiche WebLink
UNDERGROUND STORAGE TANK <br />MONITORING SYSTEM CERTIFICATION FORM (Page 5 of 6) I <br />XII. LINE LEAK DETECTOR TESTING <br />Check this box if line leak detectors (LLD) are NOT installed. (Do not complete this section.) <br />must be completed if LLDs are installed. Y N NA This section <br />Was a leak simulated <br />(Check all that <br />to verify LLD performance? • MI <br />apply.) Simulated leak rate verified: 0 3 GPH • 0.1 GPH • 0.2 GPH <br />Was the testing apparatus properly calibrated? II NI <br />For emergency generator tank systems, does the LLD create an audible and visual alarm when a leak is detected? IN II <br />For mechanical LLDs, does the LLD restrict the flow through the pipe when a leak is detected? • • <br />For electronic LLDs, does the turbine automatically shut off when a leak is detected? II • El <br />For electronic LLDs, does the turbine automatically shut off if any portion of the monitoring system is disabled or disconnected? M II <br />For electronic LLDs, does the turbine automatically shut off if any portion of the monitoring system malfunctions or fails a test? MI II A <br />For electronic LLDs, have all accessible wiring connections been visually inspected for kinks and breaks? II • & <br />Were all items on the equipment manufacturer's maintenance checklist completed? • M <br />Were all LLDs confirmed operational within regulatory requirements? 01 • MI <br />For any answer of "N" above, describe in section XIII how and when these issues were or will be corrected. <br />XIII. COMMENTS <br />XIV. VACUUM / PRESSURE/ HYDROSTATIC MONITORING EQUIPMENT TESTING <br />Check this box if VPH monitoring is NOT used. (Do not complete this section.) <br />must be completed if VPH monitoring is used to perform leak detection monitoring. This section <br />System Type (Mark all that apply.) II Vacuum M Pressure • Hydrostatic <br />Sensor ID Component(s) Monitored by this Sensor <br />Sensor Functionality <br />Test <br />Interstitial Communication <br />Test <br />Pass • Fail M Pass III Fail <br />M Pass • Fail U Pass II Fail <br />Pass II Fail M Pass • Fail <br />M Pass M Fail Pass • Fail <br />Pass MI Fail II Pass • Fail <br />Pass III Fail Pass M Fail <br />MI Pass • Fail Pass MI Fail <br />II Pass • Fail Pass • Fail <br />Pass SI Fail U Pass IN Fail <br />II Pass II Fail 0 Pass II Fail <br />IN Pass • Fail IN Pass • Fail <br />Pass • Fail Pass • Fail <br />How was interstitial II Simulated leak at far ends of the interstitial space. II Visual Inspection <br />communication verified? II Other (Describe the method in section XV below.) Gauge <br />Was the vacuum or pressure restored to operating levels in all interstitial spaces? II Yes • No (Describe the reason in section XV below.) <br />For any answer of "FAIL" above, describe in section XV how and when these issues were or will be corrected. <br />XV. COMMENTS <br />GPH = Gallons per hour, Y = Yes, N = No, NA = Not applicable, VPH = Vacuurn/Presswelflydrostatic, ID = Identification