My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
P
>
PACIFIC
>
6475
>
2900 - Site Mitigation Program
>
PR0537637
>
COMPLIANCE INFO
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/24/2022 8:58:52 AM
Creation date
3/31/2021 1:01:55 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
COMPLIANCE INFO
RECORD_ID
PR0537637
PE
2960
FACILITY_ID
FA0021678
FACILITY_NAME
LINCOLN CENTER ENVIRONMENTAL REMEDIATION TRUST
STREET_NUMBER
6475
STREET_NAME
PACIFIC
STREET_TYPE
AVE
City
STOCKTON
Zip
95207
APN
09741079
CURRENT_STATUS
02
SITE_LOCATION
6475 PACIFIC AVE
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\tsok
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
187
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Geosyntec O <br /> consultants <br /> Samples will be selected to represent each distinct geologic layer. The number of samples to be <br /> collected will be determined by the geologist after inspection of the soil core and consideration <br /> of the degree of heterogeneity in the geologic materials. <br /> 2.5 Soil Gas Probe Installation <br /> Each soil gas probe will consist of '/4-inch diameter Nylaflow® or Teflon© tubing connected <br /> with a compression fitting to a '/4-inch-diameter stainless steel sampling point. Probes will be <br /> installed inside the borehole and a sand filter pack will be placed in the annulus to a height of 6 <br /> inches above the top of the screen. Granular bentonite will be placed in two lifts of 3 inches <br /> above the filter pack and hydrated with a small amount of distilled water after each lift. A thick <br /> slurry of powdered bentonite and water will be added to seal the remainder of the borehole <br /> annulus to ground surface. The top of the probe will be fitted with a compression-fit brass or <br /> stainless steel ball valve to maintain an air-tight seal between installation and sampling. <br /> Permanent probes will be completed with a traffic rated flush mount protective casing. <br /> 3 DOCUMENTATION <br /> Field documentation will include the following information: <br /> • name and number of project; <br /> • name of field personnel; <br /> • date and time of sampling event; <br /> • list of the primary activities performed; <br /> • identification of probes drilled and installed; <br /> • relevant information (weather, attendees, equipment problems, departures from <br /> standard procedures and the reasons and responses) observed throughout the day; <br /> • field instrument information and calibration data (includes time and reading for <br /> each instrument calibration check; and <br /> • volume of probe dead space volume for each soil gas probe. <br /> 2 2014.10.17 <br />
The URL can be used to link to this page
Your browser does not support the video tag.