My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
P
>
PACIFIC
>
6475
>
2900 - Site Mitigation Program
>
PR0537637
>
COMPLIANCE INFO
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/24/2022 8:58:52 AM
Creation date
3/31/2021 1:01:55 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
COMPLIANCE INFO
RECORD_ID
PR0537637
PE
2960
FACILITY_ID
FA0021678
FACILITY_NAME
LINCOLN CENTER ENVIRONMENTAL REMEDIATION TRUST
STREET_NUMBER
6475
STREET_NAME
PACIFIC
STREET_TYPE
AVE
City
STOCKTON
Zip
95207
APN
09741079
CURRENT_STATUS
02
SITE_LOCATION
6475 PACIFIC AVE
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\tsok
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
187
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Geosyntec <br /> consultants <br /> The laboratory QA/QC manager, in consultation with the QA Manager, is responsible for <br /> implementing corrective actions in the laboratory (from sample receipt to final data <br /> deliverable). It is their combined responsibility to see that analytical procedures are <br /> followed as specified, and that data generated meet the acceptance criteria. <br /> Whenever corrective action is deemed necessary, the analytical laboratory will take the <br /> following steps: <br /> • define the problem(s); <br /> • investigate and identify the cause of the problem(s); <br /> • select appropriate corrective action(s); <br /> • implement the corrective action(s) and verify the effectiveness; and <br /> • re-establish conformance to the associated QC parameter(s). <br /> The corrective actions will be documented according to the procedures outlined in each <br /> laboratory QA Manual. <br /> Quality Assurance Project Plan I I 7 December 2020 <br />
The URL can be used to link to this page
Your browser does not support the video tag.