Geosyntec° Geosynte& <br /> consultants consultants <br /> intrusion.BPC uses a blower door to manipulate the pressure inside the building suite.Air 5. REPORTING AND SCHEDULE <br /> samples will be collected using Summa canisters while the building is depressurized.The <br /> suggested operating procedures for BPC are included in Appendix B. Pending CVRWQCB approval of the above scope of work,field implementation of soil vapor <br /> probe installation can commence within four weeks.Soil vapor probe installation is anticipated <br /> 4.6 Sub-Slab Sampling to be completed within one week.Groundwater monitoring wells and soil vapor probes should <br /> Permanent sub-slab probes will be installed in each of the suites.Sub-slab probes will be be sampled together after the soil vapor probes are allowed to equilibrate in accordance with the <br /> installed by drilling a small diameter hole through the concrete slab and placing%4-inch Teflon® agency guidance(DTSC et al,2015).Temporal data will be collected to obtain a more <br /> tubing fitted with a stainless-steel filter or Vapor Pin®through the hole.The sub-slab probes will comprehensive understanding of the seasonal effects on vapor off-gassing and migration.At <br /> be constructed in accordance with the soil vapor sampling SOP provided in Appendix B. least two sampling events(winter and summer)are proposed.Sampling may be conducted in <br /> Sub-slab probes will be installed and sampled following the completion of indoor air sampling in conjunction with the on-going groundwater monitoring that occurs at the Site. <br /> accordance with the Supplemental Guidance allowed to equilibrate at least two hours prior to <br /> sampling. Indoor air and sub-slab soil vapor data should be collected in a similar timeframe as the <br /> groundwater and soil vapor data.Indoor air and sub-slab sampling events in occupied suites need <br /> Sub-slab samples will be collected from the probes using one-liter(1L)Summa canisters.Prior to be coordinated with the occupying business'operations.The number of indoor air and <br /> to purging and sampling activities,a shut-in test and leak check will be completed in accordance sub-slab sampling events will be determined following the initial sampling event. <br /> with the SOP(Appendix B).Approximately three volumes will be purged from the sub-slab <br /> probe.One purge volume includes the internal volume of the tubing and Vapor Pin®.Purging Results from the initial investigation will be summarized in a memorandum within four weeks of <br /> and sampling will commence following a successful shut-in and leak test(i.e.no evidence of validation of all analytical data.The memorandum will summarize the findings from the <br /> leaks are found during the tests).Sub-slab samples will be collocated with indoor air samples. investigation and propose next steps as warranted. <br /> 4.7 Data Analysis and Decision Methodology <br /> Following the completion of the initial groundwater,soil vapor,indoor air,and sub-slab soil <br /> vapor sampling,the data will be evaluated and incorporated into the VI CSM.Additional <br /> investigation may be warranted if the problem statements identified in Section 3 are not <br /> addressed.The following scenarios have been identified as potential outcomes of this study: <br /> • If soil vapor analytical results do not show detected concentrations of VOCs in the <br /> vadose zone,then an assumption can be made about the geologic nature of the aquifer <br /> preventing off-gassing of VOCs from groundwater into the vadose zone. <br /> • If soil vapor analytical results show detected concentrations of VOCs in the vadose zone, <br /> additional investigation may be needed to determine the source of the VOCs detected <br /> (i.e.off-gassing from groundwater or residual vadose zone source material). <br /> • If the results from the sub-slab and indoor air sampling indicate no vapor intrusion risk <br /> (i.e.no elevated concentrations of VOCs in sub-slab or indoor air),a second sampling <br /> event may occur at least two months after the initial sampling in a new season(as <br /> defined by the Supplemental Guidance)to provide another line of evidence that no vapor <br /> intrusion potential is present. <br /> • If the results from the subsurface indicate a vapor intrusion potential(i.e.elevated <br /> concentrations of VOCs in shallow soil vapor samples)for one or both of the suites but <br /> no vapor intrusion is detected,BPC may be implemented to create worst-case scenario <br /> conditions and additional indoor air samples may be collected. <br /> 202003 Lincoln Center VI Pilot Study WPAnes 14 April 2020 202003 Lincoln Center VI Pilot Study WP.doo.¢ 15 April 2020 <br /> 4. <br />