My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2021
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
L
>
LOWER SACRAMENTO
>
18806
>
2300 - Underground Storage Tank Program
>
PR0232388
>
COMPLIANCE INFO_2021
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/2/2022 11:37:27 AM
Creation date
3/31/2021 3:28:46 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2021
RECORD_ID
PR0232388
PE
2361
FACILITY_ID
FA0003607
FACILITY_NAME
WOODBRIDGE AM PM*
STREET_NUMBER
18806
Direction
N
STREET_NAME
LOWER SACRAMENTO
STREET_TYPE
RD
City
WOODBRIDGE
Zip
95258
APN
01543010
CURRENT_STATUS
01
SITE_LOCATION
18806 N LOWER SACRAMENTO RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\kblackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
136
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
18806 N Lower Sacramento Rd, Woodbridge Record ID PR0232388 <br /> 4/26/2021 UST Inspection <br /> Photo 6: The DO report had the incorrect secondary containment date and overfill testing date. <br /> 41MEWF � I <br /> I 1 <br /> Underground Storage Tank <br /> Designated UST Operator Visual inspection Report <br /> 10. TESTING AND MAINTENANCE Yes No NA Date last <br /> performed <br /> / F <br /> T i <br /> Has monitoring system certification been completed within the past <br /> 12 months? ❑ 05-04-2020 <br /> ir Has spill container testing been completed within the past <br /> 1 � ❑ 05-04-2Q20 <br /> 2 months? <br /> Has overfill prevention equipment inspection been completed within <br /> ❑ ❑ 09-26-2018 <br /> the past 36 months? <br /> Has secondary containment testing been completed within the past ❑ ❑ D5-15-2017 <br /> 36 months? <br /> Has tank tightness testing been completed within required ❑ ❑ <br /> timeframes? <br /> Has line tightness testing been completed within the required ❑ ❑ <br /> timeframes? <br /> 0 ❑ <br /> Other Test / Maintenance: <br /> I <br /> t c Other Test / Maintenance: <br /> #' ❑ ❑ ❑ <br /> k Other Test / Maintenance: <br /> 71. FACILITY EMPLOYEE TRAINING Yes No <br /> Have all individuals performing facility employee duties received the required facility ❑ <br /> o employee training within the past 12 months? <br /> to .n0%2MaM0L11"@ <br /> John Alaniz, REHS Page 6 of 6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.