My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2021
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
G
>
GRANT LINE
>
2615
>
2300 - Underground Storage Tank Program
>
PR0521537
>
COMPLIANCE INFO_2021
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2023 1:24:05 PM
Creation date
4/1/2021 8:54:47 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2021
RECORD_ID
PR0521537
PE
2371
FACILITY_ID
FA0014623
FACILITY_NAME
WEST VALLEY AUTO SERVICE LLC
STREET_NUMBER
2615
Direction
W
STREET_NAME
GRANT LINE
STREET_TYPE
RD
City
TRACY
Zip
95304
APN
21229017
CURRENT_STATUS
01
SITE_LOCATION
2615 W GRANT LINE RD
P_LOCATION
03
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\kblackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
79
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Underground Storage Tank <br /> Secondary Containment Testing Report Form <br /> Test Method Developed by ❑ Manufacturer X Industry Standard ❑ Professional Engineer <br /> Test Type ❑ Pressure X Vacuum ❑ Hydrostatic <br /> Test Equipment Used-vacuum motor, gauges in -Hg, stop watch / timer <br /> Tank ID Regular Supreme Diesel <br /> Tank Manufacturer Xexes Xexes Xexes <br /> Tank Capacity <br /> Test Start Time <br /> Initial Reading <br /> Test End Time <br /> Final Reading <br /> Change in Reading <br /> Pass/Fail Criteria <br /> Tightness Test Results ❑ Pass ❑ Fail 1 ❑ Pass ❑ Fail 1 ❑ Pass ❑ Fail ❑ Pass ❑ Fail <br /> 7. PIPE SECONDARY CONTAINMENT TEST <br /> Test Method Developed by ❑ Manufacturer X Industry Standard ❑ Professional Engineer <br /> Test Type X Pressure ❑ Vacuum ❑ Hydrostatic <br /> Test Equipment Used: PSI pressure gauges, air, stop watch / timer <br /> Pipe Run ID Regular line Supreme line Diesel line Regular vent <br /> Pipe Manufacturer Ameron Ameron Ameron Ameron <br /> Test Start Time 60minutes 60minutes 60 minutes 60minutes <br /> Initial Reading 5psi 5psi 5psi 5psi <br /> Test End Time 0 minutes 0 minutes 0 minutes 0 minutes <br /> Final Reading 5psi 5psi 5psi 5psi <br /> Change in Reading 0 0 0 0 <br /> Pass/Fail Criteria 0/60 minutes 0/60 minutes 0/60 minutes 0/60 minutes <br /> Tightness Test Results X Pass ❑ Fail X Pass ❑ Fail X Pass ❑ Fail X Pass ❑ Fail <br /> Pipe Run ID Supreme vent Diesel vent Vapor return <br /> Pipe Manufacturer Ameron Ameron Ameron <br /> Test Start Time 60minutes 60minutes 60minutes <br /> Initial Reading 5psi 5psi 5psi <br /> Test End Time 0 minutes 0 minutes 0 minutes <br /> Final Reading 5psi 5psi 5psi <br /> Change in Reading 0 0 0 <br /> Pass/Fail Criteria 0/60 minutes 0/60 minutes 0/60 minutes 0/60 minutes <br /> Tightness Test Results X Pass ❑ Fail X Pass ❑ Fail X Pass ❑ Fail ❑ Pass ❑ Fail <br /> Additional copies of this page may be attached. <br /> 8. SUMP/UDC TEST <br /> All tests marked "Fail"and any repairs made before or during the tightness test must be described in <br /> the COMMENTS section. <br /> Page 2 of 5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.