Laserfiche WebLink
Underground Storage Tank <br /> Designated CAST Operator Visual Ing ti n Report <br /> ' <br /> NA 1TEDate last <br /> T� AND MAINTENANCE � � � <br /> performed <br /> Has monitoring system certification been completed within the past r <br /> 12 months? 313112021 <br /> Has spill container testing been completed within the past <br /> L.12 months <br /> 3/31/2021 <br /> Has overfill prevention equipment inspection been completed within f <br /> the past 112/28/201 <br /> p r�onth . <br /> Has seconds 1 t n n + <br /> secondary ti .stir been orr;ple, ted �tt�;, , Lha fast x rlC <br /> 36 months? 311512013 f <br /> Has tank tightness testing been completed within required <br /> timeframes? <br /> Has line tightness testing been completed d within the required <br /> i tirneframes <br /> Other Test 1 laintnan ; Act Testing <br /> 17 rl 'i1 <br /> 202, <br /> Other Test / Maintenance: HMBP E s Update stantek 611!2024 <br /> Other Test / Maintenance- TLS-350 PLLD 7 CSLD under continuous leak detection � U Ij J <br /> 11 . FACILITY ITY EMPL YEE TRAINING ' Yes No <br /> Have all individuals performing facility employee duties received the required facilityEx [��, <br /> employee training within the past 12 months? <br /> 13. COMMENTS - -- _:- - <br /> This endo may be used to record oor me is or observations that are not current compliance <br /> deficiencies, <br /> Sections 'VIll thru XLL Continuous in tank leak detection method TLS-350 PLLD line testing See <br /> Alarm history report. Tontlnoous in tank leak detection & Lina tightner' PLLD testing <br /> continuous <br /> All answers marked "No must be described by the designated US T operator in Section 3. <br /> Page 4f4 <br />