Laserfiche WebLink
Underground Storage Tart <br /> Secondary Containment Testing Deport Form <br /> . SUMP/UDC TEST (continued) <br /> Test Method Developed by ❑ Manufacturer ❑ Industry Standard X Professional Engineer <br /> Test Type ❑ Pressure ❑ Vacuum X Hydrostatic <br /> L Test Equipment Used: Cadwell Level Indicator, test fluid (H20 <br /> Sump:{CUD ID -4 UDC. . 5-6 UDC -8 UDC 9-10 LDDC <br /> Sump Manufacturer unknown unknown unknown ! unknown <br /> Sump Depth (inches) 28PIP 2611 28if 2811 <br /> Sump ottom to Top of 1 i r' 11 <br /> Highest Pipe Penetration <br /> (inches) <br /> Test Start Time 30 minutes 30 minutes 30 minutes 30 minutes <br /> Initial Reading first circle first c1rcle first circle first circle <br /> Test End Tlrre 0 minutes 0 minutes 0 minutes D minutes <br /> Final Reading no change no change no change no change <br /> Change in Reading <br /> Pass/Fail Criteria 0.0 2/30mins 0.002l 0rnins , 1021 0rnins 0.002l Ornins <br /> Tightness Test Results X Pass ❑ Fail X Pass ❑ Fail X Pass ❑ Fail X Pass ❑ Fail <br /> SumplUU ID 11-12 UDC <br /> Sump Manufacturer unknovu n <br /> Sump Depth (inches) 2811 <br /> Sump Bottom to Top of 11 " <br /> ' <br /> H19hast Pipe Pentraction <br /> (inches) <br /> Test Start Time 30 minutes <br /> Initial Reading first circle <br /> Test End Time 0 minutes <br /> Final Reading no change <br /> Change its Reading 0 <br /> Pass/Fail Criteria 0.002130mins 0. 2/30mins 0.002130mins 0.002/30mins <br /> Tightness Test. Results X Pass ❑ Fail ❑ Pass ❑ Fail ❑ Pass ❑ Fail ❑ Pass ❑ Fail <br /> Additional copies of this page may be attached. <br /> All tests marked "Fail'! and any repairs made before or during the tightness test mast be described in <br /> the COMMENTS section. <br /> Page 4 of <br />