My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2021
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
G
>
GRANT LINE
>
2615
>
2300 - Underground Storage Tank Program
>
PR0521537
>
COMPLIANCE INFO_2021
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2023 1:24:05 PM
Creation date
4/1/2021 8:54:47 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2021
RECORD_ID
PR0521537
PE
2371
FACILITY_ID
FA0014623
FACILITY_NAME
WEST VALLEY AUTO SERVICE LLC
STREET_NUMBER
2615
Direction
W
STREET_NAME
GRANT LINE
STREET_TYPE
RD
City
TRACY
Zip
95304
APN
21229017
CURRENT_STATUS
01
SITE_LOCATION
2615 W GRANT LINE RD
P_LOCATION
03
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\kblackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
79
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Secondary Containment Test Procedure Used To Determine Test Results <br /> Tank Secoindary Containment — The Service Technician will test and certify <br /> using methods developed and recommended by the Tank Manufacture, Industry <br /> Standard or Professional Engineer. Test procedure recommended and used is a <br /> Vacuum slowly applied to establish a stable vacuum of '" to 10"-` inches Her. for one <br /> hour using a Standard Industry Vacuurn Gauge with a grange of -o'' to -30'" <br /> measured in HgAnches of mercury. The test is completed at the end of one <br /> hour/Tants with a Volume of 20,000 Gallons or less, and 2 hours for Tanks that <br /> exceed a Volume of 20,000 Gallons, if the vacuum reading does not decrease <br /> below the established vacuum or the Threshold Criteria recommended by the Tangy. <br /> Manufacture, Industry Standard, or Professional Engineer. <br /> Product Piping Containment/Vent Piping Containment/Vapor Recovery <br /> Plping Containment — The Service Technician will test and certify using methods <br /> developed and recorrunended by the Piping Manufacture, Bravo System UDC <br /> Manufacture, industry Standard or Professional Engineer. Test procedure <br /> recommended and used is, Nitrogen Gas pressure, slowly applied to establish a <br /> stable pressure of 5 psi for one hour or 3 Psi for ] bur using a Standard Industry <br /> Pressure Gauge with a range of 0 to 15 measured in Psi/Pounds per square inch. If <br /> the Product Piping is Fiberglass and the UDC"s are a Bravo System Manufacture. <br /> constructed of Coated Steel, with an o Ring Seal at Primary/Secondary Product <br /> Piping Interface at end of Product Piping Run at UDC"s then, Bravo System <br /> Manufacture recommends a maximum applied test pressure of 3 psi. The test i <br /> completed at the end of one hour if the pressure reading does not decrease below <br /> the established pressure or the Threshold Cliteria reeonnnended by the Piping <br /> Manufacture, Bravo System UDC Manufacture, Industry Standard or Professional <br /> Engineer. <br /> Turbine/Product Piping Sump/FM Riser SurnplRemote Fill <br /> ump Tran itionNent Sump/Spill Container/Mise. Sump connected to UST <br /> Sy tem — The Service Technician will test and certify using methods developed <br /> and recommended by the Sump Manufacture, Industry Standard or Professional <br /> Engineer. The test procedure recommended and used is Hydrostatic with a level <br /> change Indicator that has been developed to indicate a standard leak rate of 14 inb <br /> lel 24 hours within 30 minutes, and <br />
The URL can be used to link to this page
Your browser does not support the video tag.