Laserfiche WebLink
Elite IV Contractors <br /> Date: 10/19/2021 <br /> Date for Inspection: 10/22/2021, Friday <br /> Time: 1o:oo AM <br /> Permit: SRoo83678, Amended <br /> Site: 3555 W Hammer Lane Stockton, CA 95219 <br /> Scope of Work: <br /> • Replace dispensers with conversion frame installation. <br /> • Cold start monitoring panel. <br /> • Convert the existing 89 octane tank to 87. <br /> A) Inspection for: Sensor functionality: Functionality of the monitoring system <br /> must be verified to ensure that monitoring has been restored. A copy of the <br /> alarm history shall be printed prior to performing the cold start of the monitoring <br /> panel and made available at the time of EHD inspection. <br /> B) Verification of the dispenser footprints contained by the under-dispenser <br /> containment sumps (UDC's). Any potential leaks from piping within the <br /> dispensers. <br /> C) Visual inspection of the piping within the dispensers. <br /> Thank you, <br /> Deborah Jones <br /> Administrative Assistant <br /> Elite IV Contractors <br /> dispatch(a)eliteiv.com <br /> (209) 461-6337 <br /> Phone:(209)461-6337 Fax:(209)461-6342 I 2535 Wigwam Dr.Stockton,CA 95205 <br /> Email:dispatch@eiiteiv.com <br />