My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2021
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
H
>
HAMMER
>
3555
>
2300 - Underground Storage Tank Program
>
PR0231130
>
COMPLIANCE INFO_2021
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/1/2021 4:41:38 PM
Creation date
4/5/2021 1:45:41 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2021
RECORD_ID
PR0231130
PE
2361
FACILITY_ID
FA0002232
FACILITY_NAME
QUIK STOP MARKET #132
STREET_NUMBER
3555
Direction
W
STREET_NAME
HAMMER
STREET_TYPE
LN
City
STOCKTON
Zip
95219
APN
071-180-20
CURRENT_STATUS
01
SITE_LOCATION
3555 W HAMMER LN
P_LOCATION
01
P_DISTRICT
003
QC Status
Approved
Scanner
SJGOV\kblackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
143
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SA <br /> N I ( � r1 I I Environmental Health Department <br /> _ C0U NTl�Y4r _ . <br /> UST SYSTEM RETROFIT OR REPAIR <br /> (Submit minimum of 3 sets of plans & applications as originals will be retained by EHD) <br /> 1 . Site map enclosed ? YES [ ] NO [ ] <br /> 2 . Submit copies of ICC Service Technician and/or Installer's certificate and all manufacturer training <br /> certificates for each person installing or testing any component that is repaired or replaced . Ensure a copy of <br /> the " Site Health and Safety Plan" is available on the jobsite as required by Title 8 . <br /> 3 . Detailed description of work to be completed . List components to be repaired or replaced and attach a <br /> diagram drawn to scale showing location of repairs and/or replacements . If repairing a component, describe <br /> how this will be done. (If adding piping , UDC 's, or other UST equipment, or performing tank top upgrade, <br /> use the UST Installation Application pages 4-8 as necessary for a timely plan review) : <br /> Remove (4) Gilbarco Advantage Dispensers . <br /> Replace with (4) Gilbarco Encore 700S Series Dispensers with Bravo Conversion Frames . <br /> Converting existing 89 Octane/10 , 000 Gallon UST to 87 Octane . <br /> Manifold existing 89 product line to 87 product line above shear valve in the UDC . <br /> Program Veeder- Root to run the two 87 turbines to turn -on sequentially . <br /> Upgrade Software on Veeder- Root . <br /> Possible Cold Start. <br /> 4 . List of equipment to be used (Attach manufacturer's specification sheets showing third-party approval) : <br /> (4) Gilbarco Encore 700S Dispensers <br /> (4) Bravo Conversion Frames <br /> 5 . Decontamination Procedures : <br /> a . Will piping be decontaminated prior to removal? YES [ ] NO [ ] <br /> b . Identify contractor performing decontamination : <br /> Name Phone (� <br /> Address City Zip <br /> 3of6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.