Laserfiche WebLink
• Standard Take Avoidance measures outlined in the HCP for nesting <br /> Swainson's hawks and burrowing owl will be required, if identified <br /> necessary by SJCOG in the ITMMs. These will include pre-construction <br /> surveys for nesting Swainson's hawks within 0.5 miles of the site for <br /> construction activities between March 1 and September 15 and pre- <br /> construction surveys for nesting burrowing owls within 250 feet of the site <br /> for construction activities commencing from February 1 through August <br /> 31. If active nests are found, temporal restrictions on construction may be <br /> required. <br /> • Standard Take Avoidance measures outlined in the HCP for nesting white- <br /> tailed kite will be required, if identified necessary by SJCOG in the ITMMs. <br /> These would include pre-construction surveys for nesting white-tailed kites <br /> within 100 feet of the site for construction activities during the nesting <br /> season. If active nests are found, temporal restrictions on construction <br /> may be required. <br /> • Trees and grasslands in the site could be used by birds protected by the <br /> Migratory Bird Treaty Act of 1918 and/or Fish and Game Code of <br /> California. If tree removal is scheduled during the nesting season of <br /> raptors (January 1 through July 31), a pre-construction survey for nesting <br /> raptors is recommended. If other vegetation removal or construction <br /> commences during the general avian nesting season (March 1 through <br /> July 31), a pre-construction survey for all species of nesting birds is <br /> recommended. If active nests are found, work in the vicinity of the nests <br /> should be delayed until the young fledge. <br /> • The site is not within designated critical habitat of any federally listed <br /> species. <br /> 2706 Pock Lane: Biology 25 November 23, 2021 <br />