Laserfiche WebLink
As previously noted, all potentially significant environmental effects identified in the <br /> IS/MND would be avoided or reduced to a level that would be less than significant with <br /> recommended mitigation measures. For all other issues, the project would have no impact <br /> or would have impacts that are less than significant. <br /> Pock Lane Public Review Draft IS/MND 1-4 May 2022 <br />