Laserfiche WebLink
Health Department. The Hazardous Material Business Plan must be prepared by any <br /> facility that handles a hazardous material, or mixture containing a hazardous material, of <br /> a quantity at any one time during the reporting year equal to or greater than 55 gallons for <br /> liquids, 500 pounds for solids, or 200 cubic feet for a compressed gas. None of the <br /> proposed land uses would involve any substantial use of hazardous materials, or any uses <br /> that would trigger Hazardous Material Business Plan requirements. Project impacts <br /> related to transport,use, or storage of hazardous materials would be less than significant. <br /> b)Release of Hazardous Materials by Upset or Accident. <br /> Construction activities on the project site may involve the use of hazardous materials <br /> such as fuels and solvents, and thus create a potential for hazardous material spills during <br /> the construction process. Construction and maintenance vehicles would transport and use <br /> fuels in ordinary quantities. Fuel spills, if any occur, would be minimal and localized and <br /> would not typically have significant adverse effects. Potential hazardous materials spills <br /> during construction are addressed in the required SWPPP, described in Section 3.7, <br /> Geology and Soils. In accordance with SWPPP requirements, contractors have absorbent <br /> materials at construction sites to clean up minor spills. Other substances used in the <br /> construction process would ordinarily be stored in approved containers and used in <br /> relatively small quantities, in accordance with the manufacturers' recommendations <br /> and/or applicable regulations. <br /> As noted in a) above, project operations would not involve the transport, use, or storage <br /> of hazardous materials in substantial quantities. Any releases of these materials are not <br /> expected to be in quantities large enough to pose a threat to human health and the <br /> environment. Overall, impacts related to releases of hazardous materials would be less <br /> than significant. <br /> c) Release of Hazardous Materials near Schools. <br /> The nearest school to the project site is Hamilton Elementary School, on 2245 East 11th <br /> Street within one-quarter mile of the project site. However, as noted in b) above, project <br /> construction and operations would not require the handling or transport of acutely <br /> hazardous materials or waste in amounts that would endanger schools or the public. The <br /> project would not produce hazardous emissions. The use of small quantities of hazardous <br /> materials during project construction would be limited to the project site. The project <br /> would have no impact related to hazardous material releases near schools. <br /> d)Hazardous Materials Sites. <br /> As previously noted, a search of the GeoTracker and EnviroStor databases, along with <br /> SWRCB lists, did not identify any active hazardous material sites on or near the project <br /> site. However, the project site has been in agricultural use until recently, and past <br /> agricultural activities may have left residues of agricultural chemicals in the soils, which <br /> are a potential hazard to future residents and construction workers if residue <br /> concentrations are at a level that can affect human health. This is of particular concern for <br /> a residential project, as residents could potentially be exposed to these residues. <br /> Agricultural chemicals are typically applied in dilute concentrations, and most degrade <br /> Pock Lane Public Review Draft IS/MND 3-40 May 2022 <br />