Laserfiche WebLink
HCM 6th TWSC Timing Plan: PM Peak <br /> 7: Pock Ln & Loomis Rd 05/03/2022 <br /> intersection <br /> Int Delay,s/veh 1.9 <br /> Moveme BL SBT SBR <br /> Lane Configurations 4141 <br /> kaffic Vol,veh/h 51 196 13 <br /> Future Vol,veh/h 11 0 0 5 0 30 0 152 9 51 196 13 <br /> Conflicting Peds,#/hr �0 0 0 0 1W 0 0 <br /> Sign Control Stop Stop Stop Stop Stop Stop Free Free Free Free Free Free <br /> RT Channelized None - None None <br /> Storage Length - - - - <br /> Veh in Median Storage,# 0; - 411"w - 0 0 <br /> Grade, % 0 - 0 - 0 0 <br /> Peak Hour Factor 92 92 92 92 92 92 92 92 92 92 92 92 <br /> Heavy Vehicles,% 2 2 2 2 2 2 2 2 2 2 2 2 <br /> Mvmt Flow 12 0 0 5 0 33 0 165 10 55 213 14 <br /> Major/Minor �inor2 Minorl <br /> Conflicting Flow All 517 505 220 500 507 170 227 0 0 175 0 0 <br /> Stage 1_ 330 330 - 170 170 <br /> Stage 2 187 175 - 330 337 - - - - - - - <br /> Lritical HdwyAW 7.12 6.52 6.22 7.12 6.52 6.22 4.12 <br /> Critical Hdwy Stg 1 6.12 5.52 - 6.12 5.52 - - - - - - <br /> fritical Hdwy Stg 2 6.12 5.52 - 6.12 5.52 - - <br /> Follow-up Hdwy 3.518 4.018 3.318 3.518 4.018 3.318 2.218 - 2.218 - - <br /> Pot Cap-1 Maneuver 469 470 820 481 468 874 1341 - <br /> Stage 1 683 646 - 832 758 - - - - - - <br /> Stage 2 815 754 - 683 641 - - <br /> Platoon blocked, % - - - <br /> Mov Cap-1 Maneuver 436 449 820 465 447 874 1341 - <br /> Mov Cap-2 Maneuver 436 449 - 465 447 - - - - - - <br /> Stage 1 &83 jft 832 758 - - - - - - <br /> Stage 2 785 754 - 652 612 - - - - - - - <br /> Approach EB <br /> HCM Control Delay,s 13.5 9.9 —qw— 0 1.5 <br /> HCM LOS B A <br /> �jor NBL NBT NBR EBLnlWBLnl SBL SBT SBR <br /> �h) 1341 - 436 776 1401 - - <br /> HCM Lane V/C Ratio - - - 0.027 0.049 0.04 - - <br /> HCM Control Delay(s) 0 - 13.5 9.9 7.7 0 <br /> HCM Lane LOS A B A A A - <br /> HCM 95th%tile Q(veh) 0 - 0.1 0.2 0.1 - <br /> Pock Lane Residential TIS:Existing plus Project Conditions Synchro 11 Report <br /> TJKM Page 7 <br />