Laserfiche WebLink
HCM 6th TWSC Timing Plan: AM Peak <br /> 7: Pock Ln & Loomis Rd 05/03/2022 <br /> �tersection IL <br /> Int Delay,s/veh 0.2 <br /> ovemen EBL E MT WBR NBL NE NBR SB <br /> Lane Configurations 4141 <br /> kaffic Vol,veh/h 11 <br /> Future Vol,veh/h 6 0 0 0 0 0 0 233 0 0 187 11 <br /> Conflicting Peds,#/hr �w 0 0 0 VFEW 0 <br /> Sign Control Stop Stop Stop Stop Stop Stop Free Free Free Free Free Free <br /> RT Channelized None - None None <br /> Storage Length - - - <br /> Veh in Median Storage,# - - 0 0 <br /> Grade, % 0 - - 0 - - 0 0 <br /> Peak Hour Factor 92 92 92 92 92 92 92 92 92 92 92 92 <br /> Heavy Vehicles,% 2 2 2 2 2 2 2 2 2 2 2 2 <br /> Mvmt Flow ; 7 0 0 0 0 iQ 0 253 0 0 203 12 <br /> Major/Minor �inor2 Minor1 <br /> Conflicting Flow All 462 462 209 462 468 253 215 0 0 253 0 0 <br /> Stage 1� 209 209 - 253 253 <br /> Stage 2 253 253 - 209 215 - - - - - - - <br /> Lritical HdwyAW 7.12 6.52 6.22 7.12 6.52 6.22 4.12 - <br /> Critical Hdwy Stg 1 6.12 5.52 - 6.12 5.52 - - - - - - <br /> fritical Hdwy Stg 2 6.12 5.52 - 6.12 5.52 - - - - <br /> Follow-up Hdwy 3.518 4.018 3.318 3.518 4.018 3.318 2.218 2.218 - - <br /> Pot Cap-1 Maneuver 1510 497 831 510 493 786 1355 - 1312-==� <br /> Stage 1 793 729 - 751 698 - - - <br /> Stage 2 751 698 - 793 - - - <br /> Platoon blocked, % <br /> Mov Cap-1 Maneuver 510 497 831 510 493 786 1355 - 1312 <br /> Mov Cap-2 Maneuver 510 497 - 510 493 - - - <br /> Stage 1 j&93 8 - - - <br /> Stage 2 751 698 - 793 725 - - <br /> Approach EB NB SB <br /> HCM Control Delay,s 12.2 0 0 <br /> HCM LOS B A <br /> �jor NBL NBT NBR EBLn1WBLn1 SBL SBT SBR <br /> �h) 1355 - 510 1312 - - <br /> HCM Lane V/C Ratio - - - 0.013 - - <br /> HCM Control Delay(s) 0 - 12.2 0 0 - <br /> HCM Lane LOS A - B A A - <br /> HCM 95th%tile Q(veh) 0 - I 0 - 0 - - <br /> Pock Lane Residential TIS:Cumulative Conditions Synchro 11 Report <br /> TJKM Page 7 <br />