Laserfiche WebLink
HCM 6th TWSC Timing Plan: PM Peak <br /> 7: Pock Ln & Loomis Rd 05/03/2022 <br /> �tersection IL <br /> Int Delay,s/veh 0.4 <br /> ovemen EBL E MT WBR NBL NE NBR SB <br /> Lane Configurations <br /> kaffic Vol,veh/h 15 <br /> Future Vol,veh/h 13 0 0 0 0 0 0 138 0 0 164 15 <br /> Conflicting Peds,#/hr �w 0 0 0 VFEW 0 <br /> Sign Control Stop Stop Stop Stop Stop Stop Free Free Free Free Free Free <br /> RT Channelized None - None None <br /> Storage Length - - - <br /> Veh in Median Storage,# 0; - 411"w - 0 0 <br /> Grade, % 0 - 0 - 0 0 <br /> Peak Hour Factor 92 92 92 92 92 92 92 92 92 92 92 92 <br /> Heavy Vehicles,% 2 2 2 2 2 2 2 2 2 2 2 2 <br /> Mvmt Flow 14 0 0 0 0 ;Q 0 150 0 _.I� 178 16 <br /> Major/Minor �inor2 Minor1 <br /> Conflicting Flow All 336 336 186 336 344 150 194 0 0 150 0 0 <br /> Stage 1� 186 186 - 150 150 <br /> Stage 2 150 150 - 186 194 - - - - - - - <br /> Lritical HdwyAW 7.12 6.52 6.22 7.12 6.52 6.22 4.12 - <br /> Critical Hdwy Stg 1 6.12 5.52 - 6.12 5.52 - - - - - - <br /> fritical Hdwy Stg 2 6.12 5.52 - 6.12 5.52 - - - - <br /> Follow-up Hdwy 3.518 4.018 3.318 3.518 4.018 3.318 2.218 2.218 - - <br /> Pot Cap-1 Maneuver 618 585 8568 579 896 1379 - 1431�� <br /> Stage 1 816 746 - 853 773 - - - - <br /> Stage 2 853 773 - 816 740 - - - - <br /> Platoon blocked, % - - <br /> Mov Cap-1 Maneuver 618 585 856 618 579 896 1379 - - 1431 <br /> Mov Cap-2 Maneuver 618 585 - 618 579 - - - - - <br /> Stage 1 &6 746 - 853 77� - - - <br /> Stage 2 853 773 - 816 740 - - <br /> Approach EB NB SB <br /> HCM Control Delay,s 11 0 0 0 <br /> HCM LOS B A <br /> �jor NBL NBT NBR EBLn1WBLn1 SBL SBT SBR <br /> �h) 1379 - 618 1431 - - <br /> HCM Lane V/C Ratio - - 0.023 - - <br /> HCM Control Delay(s) 0 - 0 0 - <br /> HCM Lane LOS A - - B A A - <br /> HCM 95th%tile Q(veh) 0 - OF- 0.1 - 0 - - <br /> Pock Lane Residential TIS:Cumulative Conditions Synchro 11 Report <br /> TJKM Page 7 <br />