My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU0014057
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
P
>
POCK
>
3009
>
2600 - Land Use Program
>
PA-2100032
>
SU0014057
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/3/2024 9:19:06 AM
Creation date
4/7/2021 2:29:35 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
RECORD_ID
SU0014057
PE
2611
FACILITY_NAME
PA-2100032
STREET_NUMBER
3009
Direction
S
STREET_NAME
POCK
STREET_TYPE
LN
City
STOCKTON
Zip
95205-
APN
17912011, -13, -14
ENTERED_DATE
4/7/2021 12:00:00 AM
SITE_LOCATION
3009 S POCK LN
RECEIVED_DATE
7/6/2022 12:00:00 AM
P_LOCATION
99
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\gmartinez
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1833
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
HCM 6th AWSC Timing Plan: PM Peak <br /> 6: Pock Ln & Boeing Way 05/03/2022 <br /> Nersecti <br /> Intersection Delay,s/veh10.3 <br /> Intersection LOS <br /> Movement Er NNBR SBL <br /> Lane Configurations Vii <br /> Traffic Vol,veh/h 48 41 11 22 9 38 123 25 <br /> Future Vol,veh/h 48 41 11 22 47 28 9 199 9 38 123 25 <br /> Peak Hour Fac�0.66 0.66 0.66 0.72 0.72 U 0.91 0.89 0.89 0.89 <br /> Heavy Vehicles,% 2 2 2 2 2 2 2 2 2 2 2 2 <br /> Mvmt Flow 73 62 17 31 65 39 10 43 138 28 <br /> Number of Lanes 0 1 0 0 1 0 1 1 0 1 1 0 <br /> Approa WB SB <br /> Opposing Approach WB EB SB NB <br /> Opposing Lanes i 1 2 <br /> Conflicting Approach Left SB NB EB WB <br /> Conflicting Lanes Le� 2 1 1 <br /> Conflicting Approach RighNB SB WB EB <br /> Conflicting Lanes Righj� 2 1 ' 1 <br /> HCM Control Delay 10 9.6 11.2 10 <br /> A A B A <br /> NBLn1 NBLn2 EBLnlWBLnl SBLn1 SBLn2 <br /> Vol Left, % 100% 0% 48% 23% 100% 0% <br /> Vol Thru,% 0% 96% 41% 48% 0% 83% <br /> Vol Right,% 0% 4% 11% 29% 0% 17% <br /> Sign Cont r Stop Stop ttop Stop Stop Stop <br /> Traffic Vol by Lane 9 208 100 97 38 148 <br /> LT Vol 9 0 48 22 38 0 <br /> Through Vol 0 199 41 47 0 123 <br /> RT Vol JMQ� 0 � ' '8 0 25 <br /> Lane Flow Rate 10 229 152 135 43 166 <br /> Geometry Grp ff' 7 JIMIMFTW2 7 7 <br /> Degree of Util(X) 0.017 0.355 0.228 0.198 0.073 0.255 <br /> Departure He§ay(Hd) 6.123 5.586 5.421 5.283 6.146 5.521 <br /> Convergence,Y/N Yes Yes Yes Yes Yes Yes <br /> Cap � 587 647 665 680 584 652 <br /> Service Time 3.833 3.297 3.434 3.312 3.872 3.246 <br /> HCM Lane VIC Ratio 0.017 0.354 0.229 0.199 0.074 0.255 <br /> HCM Control Delay 8.9 11.3 10 9.6 9.4 10.1 <br /> HCM Lane LOS <br /> HCM 95th-tile Q 0.1 1.6 0.9 0.7 0.2 1 <br /> Pock Lane Residential TIS: Cumulative plus Project Conditions Synchro 11 Report <br /> TJKM Page 6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.