My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU0014057
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
P
>
POCK
>
3009
>
2600 - Land Use Program
>
PA-2100032
>
SU0014057
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/3/2024 9:19:06 AM
Creation date
4/7/2021 2:29:35 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
RECORD_ID
SU0014057
PE
2611
FACILITY_NAME
PA-2100032
STREET_NUMBER
3009
Direction
S
STREET_NAME
POCK
STREET_TYPE
LN
City
STOCKTON
Zip
95205-
APN
17912011, -13, -14
ENTERED_DATE
4/7/2021 12:00:00 AM
SITE_LOCATION
3009 S POCK LN
RECEIVED_DATE
7/6/2022 12:00:00 AM
P_LOCATION
99
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\gmartinez
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1833
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ltii <br /> GQI INC-. 4230 Kiernan Ave.,Ste.1501 Modesto,CA 953561 Ph:(209)543.1799 1 Fax:(209)501775 <br /> March 30, 2021 CTE Job No. 25-1097G <br /> Attention: Mr. Anthony Barkett <br /> 119 East Weber Ave <br /> Stockton, California 95202 <br /> Subject: Geotechnical Engineering Investigation <br /> New Residential Subdivision <br /> APN 179-120-13 & 179-120-14 <br /> 2706 Pock Lane <br /> Stockton, California 95205 <br /> Dear Mr. Barkett, <br /> In accordance with your request and authorization of CTE CAL Inc. (CTE)proposal dated January <br /> 25,2021, CTE has completed a geotechnical investigation at the above referenced project site. The <br /> attached report contains the results of our subsurface investigation, laboratory testing program, <br /> and engineering evaluation of the geotechnical and geological elements of the project site. <br /> Specifically, the report provides geotechnical engineering design parameters and construction <br /> recommendations for the design and development of the proposed project structures and site <br /> improvements. <br /> Based on CTE's subsurface investigations, site materials testing, and our geotechnical and <br /> engineering evaluation,the project is considered feasible from a geotechnical standpoint provided <br /> the recommendations contained in the attached report are incorporated into the project design and <br /> construction. If you have any questions regarding our findings or recommendations, please do not <br /> hesitate to contact this office. The opportunity to be of service is appreciated. <br /> Respectfully submitted, <br /> CTE CAL, INC. 4ROPESSIo,v-� <br /> KFc� �� J <br /> A <br /> C 98971 <br /> Mike Kennedy, PE 88971 Rameel Shabdin <br /> Project Engineer CIVIL Staff Geologist <br /> or cntiY <br /> SACRAMENTO FREMONT MODESTO <br /> INSPECTION&TESTING•GEOTECHNICAL-ENVIRONMENTAL-CONSTRUCTION ENGINEERING <br />
The URL can be used to link to this page
Your browser does not support the video tag.