AGGREGATE ABSORPTION AREA (A) <br />A = 1,440 f 2 (8 ft wide x 180 ft long) <br />MOUND DEPTHS <br />Washed Sand = 12 in. <br />Aggregate Absorption Area thickness =9 in. <br />(6 in. of aggregate below the laterals, 1 in. for pipe height and 2 in. for cover over pipe = 9 inches) <br />Thickness of Topsoil = 8 in. Cap over Aggregate Absorption Area = 12 in <br />OVERALL BASAL AREA: LENGTH AND WIDTH (L x W) <br />L = 200 ft N-S <br />W=30 ftE-W <br />Area = 6000 ft2 <br />SOH, COVER <br />The soil cap and soil cover must consist of a silt loam material to allow oxygen diffusion into the <br />mound system (USCS = m1). This will entail importing silt loam material since onsite material is <br />clay. The mound slopes will not exceed 5:1, which will place the height of the mound at <br />approximately 2.75 feet higher than surrounding grade. Natural or planted grass vegetation must <br />be allowed to grow on this soil cap to maintain soil stability. <br />REPLACEMENT/RESERVE AREAS <br />Because the mound system footprints for the two proposed residential structures envelop <br />significant area, insufficient replacement area exists. Therefore, when the primary systems fail <br />(indicative of surfacing sewage), the only alternative is to remove them and construct new mound <br />systems over the existing footprints. It is anticipated that the primary mound systems have an <br />approximate two decades long lifespan provided that the entire system is monitored and <br />maintained on a yearly schedule. <br />Regarding setbacks for the subject Parcel, there is a distance of 104 ft from the east property line <br />to the toe of the existing building pad embankment for the north building pad. For a fill bank, the <br />disposal area must not encroach within 4 times the vertical ht of the fill bank, as measured from <br />the top edge of the bank. The building pad is 10 ft high; therefore, measuring from the top edge <br />of the bank: 4 x 10 = 40 ft minus 18 ft (embankment horizontal distance) =22 ft from the toe of <br />the embankment. As illustrated on the design plans, there is sufficient setback distance for both <br />building pads on the subject Parcel. <br />D. MOUND SYSTEM OPERATIONAL COMPONENTS <br />CONFIGURATION OF PRESSURE DISTRIBUTION NETWORK <br />The distribution piping (laterals) will discharge the effluent uniformly over the drain rock bed, with <br />orifices spread five-foot apart so that effluent application area is -5 fe/orifice. Force main (transport line) <br />piping will directly connect to the two laterals. The two laterals are to be 4 ft apart. Orifices shall be <br />drilled with a new 7/64" dia. drill. A squirt test should then be conducted, and if sufficient for 5 ft of <br />distal head pressure at the ends of each lateral, re-drill each orifice to 1/8" dia. Orifices are to be installed <br />facing up, with orifice shields connected. Clean-outs at the distal ends of the two laterals will extend <br />upward with long-sweep turn-ups with control valves. These clean-outs are to be placed within access <br />boxes, as described on the design plans. <br />10 <br />Chesney Consulting