My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
T
>
THORNTON
>
26056
>
2900 - Site Mitigation Program
>
PR0545730
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/13/2021 3:30:30 PM
Creation date
4/13/2021 3:20:20 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
RECORD_ID
PR0545730
PE
2957
FACILITY_ID
FA0005194
FACILITY_NAME
DONNA GARDNER
STREET_NUMBER
26056
STREET_NAME
THORNTON
STREET_TYPE
RD
City
THORNTON
Zip
95686
APN
00115046
CURRENT_STATUS
02
SITE_LOCATION
26056 THORNTON RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\tsok
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
96
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Smith Environmental SITE SAFETY PLAN <br />Physical Hazards <br />Task(s) <br />Hazard <br />Mitigation Measure <br />1 <br />Heavy Equipment (Noise & Physical <br />All heavy equipment used on this project will <br />contact) <br />be in good working order and operated in <br />accordance with recognized industry standards <br />and Cal -OSHA Title 8, Subchapter 4, <br />Construction Safety Orders. In addition, an <br />exclusion zone applies to all personnel. The <br />exclusion zone will be 20 feet to the front and <br />either side of the operating drill rig. Personnel <br />will not be allowed under booms or augers at <br />any time. <br />All equipment operators and ground crews <br />working in close proximity of heavy equipment <br />will be supplied with ear protection. <br />Dust <br />The dust hazard will be mitigated by not <br />allowing ground crew to be located down wind <br />of drilling and excavation activity. In addition, <br />water will be applied to control the dust if <br />visible levels of dust are generated. <br />Fire and Explosion Hazards <br />List Flammable or Combustible materials on-site. Keep sources of ignition away from these <br />materials. <br />Flammable (Flash Point <100 °F) Combustible (Flash Point <200 *F) <br />Gasoline <br />Type and Location of Fire Extinguishers (Show on map for large projects) <br />Dry chemical fire extinguishers Class A B and C. are stored in all Smith Environmental vehicles. <br />PAGE 6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.