My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
E
>
EL DORADO
>
1502
>
2900 - Site Mitigation Program
>
PR0540300
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/13/2021 3:30:55 PM
Creation date
4/13/2021 3:23:28 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
RECORD_ID
PR0540300
PE
2960
FACILITY_ID
FA0023037
FACILITY_NAME
FORMER UNOCAL NO 4409
STREET_NUMBER
1502
Direction
N
STREET_NAME
EL DORADO
STREET_TYPE
ST
City
STOCKTON
Zip
95204
APN
12708018
CURRENT_STATUS
01
SITE_LOCATION
1502 N EL DORADO ST
P_LOCATION
01
QC Status
Approved
Scanner
SJGOV\tsok
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
61
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
GAVIN NEWSOM <br />GOVERNOR <br />Water Boards <br />A‹,'S JSEACRREEToABRYLUFMOERNFELD <br />ENVIRONMENTAL PROTECTION <br />Central Valley Regional Water Quality Control Board <br />21 May 2020 <br />Mr. Atir Chak <br />Mr. and Mrs. Mandeep and Rudy Singh <br />Phillips 66 Company 2652 Cornflower Street <br />390 Kilroy Airport Way — Suite 210 <br /> <br />Stockton, CA 95212 <br />Long Beach, CA 90806 <br />Request for Work Plan Addendum, Former Tosco/Unocal #05643 AKA #4409, <br />1502 North El Dorado Street, Stockton, San Joaquin County <br />Dear Mr. Chak, and Mr. and Mrs. Singh, <br />The former Tosco/Unocal #05643 AKA #4409 is located at 1502 North El Dorado Street <br />in Stockton (Site). On 13 May 2020, Central Valley Regional Water Quality Control <br />Board (Central Valley Water Board) staff and GHD (GHD) staff meet via teleconference <br />to discuss current Site conditions and the path to closure for the Site. <br />During the meeting, we agreed that GHD would install an additional B zone <br />groundwater monitoring well to the east-northeast of Site well MW-14, and a nested or <br />co-located B and Ozone well pair north of MW-13 and MW-14, along a transect <br />between the onsite release point and the down-gradient water supply well "well 10". <br />Please submit a Work Plan Addendum by 30 July 2020 presenting a scope of work for <br />installation of the three wells discussed during the 13 May 2020 meeting. <br />KARL E. LONGLEY ScD, P.E., CHAIR I PATRICK PULUPA, ESQ., EXECUTIVE OFFICER <br />11020 Sun Center Drive #200, Rancho Cordova, CA 95670 I www.waterboards.ca.govicentralvalley
The URL can be used to link to this page
Your browser does not support the video tag.