My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
E
>
EL DORADO
>
1502
>
2900 - Site Mitigation Program
>
PR0540300
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/12/2026 9:09:16 AM
Creation date
4/13/2021 3:23:28 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
RECORD_ID
PR0540300
PE
2960 - RWQCB LEAD AGENCY CLEAN UP SITE
FACILITY_ID
FA0023037
FACILITY_NAME
FORMER UNOCAL NO 4409 TOSCO/UNOCAL #05643
STREET_NUMBER
1502
Direction
N
STREET_NAME
EL DORADO
STREET_TYPE
ST
City
STOCKTON
Zip
95204
APN
12708018
CURRENT_STATUS
Active, billable
QC Status
Approved
Scanner
SJGOV\gmartinez
Supplemental fields
Site Address
1502 N EL DORADO ST STOCKTON 95204
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
131
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PMR <br /> bma <br /> samples will be collected using bailers or pumps and decanted into the appropriate containers <br /> supplied by the analytical laboratory. Samples will be labeled, stored on ice at or below 4 degrees <br /> Celsius, and transported under chain-of-custody to the laboratory. <br /> 5.12 Water Supply Well Survey <br /> GHD plans to conduct an additional water supply well survey in the immediate vicinity of the site to <br /> ensure residences located near the site are connected to a water service. The nearest known <br /> water supply well (Well 10) is located approximately 1,020 feet downgradient of the site. To verify <br /> that this is the nearest water supply well, GHD will contact California Water Service of Stockton to <br /> determine if all local residences are currently connected to the municipal water supply. <br /> Furthermore, GHD will conduct a door-to-door survey to identify any other water supply wells in the <br /> immediate vicinity of the site. <br /> 5.13 Schedule and Reporting <br /> GHD will implement the proposed amended work plan after receiving approval from the CVRWQCB, <br /> or within 60 days of work plan submittal. GHD will prepare and submit Department of Water <br /> Resources (DWR) Well Completion Reports (Form 188)to the DWR, and will submit a well <br /> installation report summarizing site assessment activities to the CVRWQCB within 90 days of <br /> completing the fieldwork. The report will include all analytical laboratory reports, permits, and <br /> provide conclusions and recommendations. <br /> GHD I Well Installation Work Plan Addendum 111193145(5)I Page 6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.