R❑❑HEH -1 Ll IJL❑
<br /> STATE OF CALIFORNIA STATE OF CALIFORNIA STATE OF CALIFORNIA
<br /> Mechanical Systems Mechanical Systems Mechanical Systems
<br /> NRCC-MCH-E CALIFORNIA ENERGY COMMISSION NRC[-MCH-E CALIFORNIA ENERGY COMMISSION NRCC-MCH-E CALIFORNIA ENERGY COMMISSION
<br /> CERTIFICATE OF COMPLIANCE NRCC-MCH-E CERTIFICATE OF COMPLIANCE NRCC-MCN-E CERTIFICATE Of COMPLIANCE NRCC-MCH-E
<br /> Project Name: RESTAURANT T.I. Report Page:
<br /> Project Name: RESTAURANT T.I. Report Page: (Page 3 of 9) Project Name: RESTAURANT Ll.Report Page: (Page 4 of 9) (Page 5 of 9)
<br /> Project Address Project Address: 3081 N.TRACY BLVD. Date Prepared: 9/15/2020
<br /> Project Address: 3081 N.TRACY BLVD-Date Prepared: 9/15/2020 - 3081 N.TRACY BLVD.Date Prepared: 9/15/2020
<br /> I.SYSTEM CONTROLS � ceD
<br /> G. PUMPS c .�
<br /> F. HVAC SYSTEM SUMMARY(DRY&WET SYSTEMS) *Notes:Controls with a*require a note in the space below explaining how compliance is achieved.EX:system 1:SA Temp Reset:Exempt because zones compliant with 140,4 d co
<br /> This table is used to demonstrate compliance for mechanical equipment with mandatory requirements found in 110.1 and 110-2 a and prescriptive requirements found in 140.4 a This section does not apply to this project. EXCEPTION 1 to 140.4 f I
<br /> §140.4Lb) and§140.4(k) or§141.01b)2 for alterations. I
<br /> D System Equipment Sizin H. FAN SYSTEMS&AIR ECONOMIZERS 00 co
<br /> J.VENTILATION AND INDOOR AIR QUALITY -�
<br /> Dry VB(includes air conditioners,condensers,heat pumps,VRF,furnaces and unit heaters} z v� .--..--.
<br /> This table is used to demonstrate tam Dance with rescri five re uirements ound in 140. c 140.4 a and 140.4 m or an s stems.Fans stems servin ons rocess loads are m co
<br /> 41 02 03 04 05 06 07 O8 09 10 11 p p p q f �� ( )f f y y g y p This table is used to demonstrate compliance with mandatory ventilation requirements in120.1 and§120.2(e)36 for all nonresidential,high-rise residential and hotel/motel "4 :~ cit
<br /> Equipment Sizing per Mechanical Schedule(kBtu/h)
<br /> d
<br /> exempt ram these requirements and do not need to be included in Table H. occupancies.For alterations,only ventialtion systems being altered within the scope of the permit appiicatfon need to be documented in this table. in lieu of this table,the required E; ,�
<br /> CO CO
<br /> 140.4 a&b System s Economizer Designed per 140.4 a and outdoor ventilation rates and airflows may be shown on the plans or the calculations can be presented in a spreadsheet. Z .5 c
<br /> §_( ) FLOOR PLAN Economizer: Fixed Temperature System Fan Type: Constant Volume W a
<br /> Name: Controls: (m) 01 ❑ Check the box if the project is showing ventilation calculations on the plans,or attaching the calculations instead of completing this table. PC! $ Co
<br /> Smallest Size Heating Output2 3 Cooling Output'3 Load Calculations34 01 02 03 04 05 06 07 OS N
<br /> 02 ® Check this box if the project included Nonresidential or Hotel/Motel spaces E-
<br /> Name or item Equipment Category per Equipment Type per Tables 11fl•2& Available' Tata! W � c_;,
<br /> cTag Tables 110.2 Titl Supp. Tota! Fan Power Pressure prop Adjustment Table 140.4-B ❑ Check this box if the project included new or altered high-rise residential dwelling units. � r- U
<br /> Sensible Sensible Fan Name or y (CFM) HP Unit' Design HP Design Airflow through 03 Z cs 0_;
<br /> 140.4 a per Design Rated Heating Rated Heating Fan Function Qty Maximum Design Supply Airflow Device ❑ Check the box if the project is using natural ventilation in any nonresidential or hotel/motel spaces to meet required ventilation rates per§120.1fc12. Z t c)
<br /> kBtu/h) (kBtu/h Output Per Design Cooling Item Tag
<br /> ( ) p (kStu/h) [kBtu/h} Load Load Device(CFM) Nonresidential and Hotel Motel Ventilation Systems ao w o
<br /> (kBtu/h] (kBtu/h) (kBtu/h) SF Supply 1 2000 BHP 0.85 / cd
<br /> 04 05 06 07 I>ti tw
<br /> cC\2 ^C o Ua
<br /> NA: Load Total System Design Maximum System Fan Z c�2
<br /> FLOOR PLAN Unitary AC/Condensers AC,air-cooled pkg(3 phase) 56 56 0 49.45 42.7 99.98 98.71 Total System Design Supply Airflow(CFM]: 2000 0.85 1.88 Air Filtration perL129 c _ _
<br /> Controls g HP: p L129 t } and 141A 6 2' 0 =$ W pq •0 `o
<br /> ( ) Power(8)HP: System Design OA CFM S stem Desi nco
<br /> System Name FLOOR PLAN Airflows 784 Transfer Air CFM 0 per 12p,1 c (NR and V) F U
<br /> V)
<br /> co
<br /> FOOTNOTES:Equipment shat!be the smallest size, within the available options of the desired equipment line,necessary to meet the design heating and cooling loads of the building per 'FOOTNOTES:Computer room economizers must meet requirements of 140.9 a and will be documented on the NRCC-PRC-E document. W � � � � �
<br /> Hotel/Motel)) A c� c, pc"w
<br /> 5140.41G). Healthcare facilities are excepted. 'The unit used for HP must be consistent for all fans within a system. 08 09 10 11 12 13 14 15 16 F, W
<br /> zit is common practice to show rated output capacity on the equipment schedule.Sensible cooling output comes from specification sheet tables. 4 5Cd
<br /> a
<br /> Mechanical Ventilation Required per§120.1X)3 3 Exh.Vent per 120.1 c 4 ca a w0--
<br /> of
<br /> If equipment is heating only, leave cooking output and load blank.If equipment is cooling only,leave heating output and load Monk. I.SYSTEM CONTROLS W � � �
<br /> Space Name Conditioned #of Shower #of Required DCV or Sensor Controls per§120.1(d13. ce
<br /> a Authority Having jurisdiction may ask for load calculations used for compliance per 140.4 b . This table is used to demonstrate compliance with mandatory controls in 110.2 and 120.2 and prescriptive controls in 140.4 and(n)or requirements in 141.0 b 2E for altered of item Tag a Required Provided per Design .--�
<br /> Dry System Equipment Efficiency(other than Package Terminal Air Conditioners(PTAQ and Package Terminal Heat Pumps(PTHP}] space conditioning systems. Occupancy Type Floor Area heads/ s Min OA p g �120.1(d)5,and§120.1(e)3 6 W I I
<br /> z people Min CFM CFMp., C W W
<br /> (ft ) toilets CFM
<br /> 01 02 03 04 05 06 07 0$ 09 OZ 02 03 04 05 06 07 08 09
<br /> DCV Provided per
<br /> Heating Moe Cooling Mode Conditioned Thermostats Shut-Off Isolation ] 0 1 d
<br /> Minimum System Floor Area Zane Demand Response Supply Air Window Interlocks per FLOOR PLAN Restaurant Dining Rooms 1568 784 0 0 § 2 Ld
<br /> Minimum System Name 110. h &(c)s, Controls p Tem Reset p NA:Not required
<br /> Name or Item Size Category Ratio Efficient Zoning Being Served Controls 11 p' space type
<br /> Rating V Efficiency (ft ) §120,2(a}or §141.OIb12E 120.2 a 120.2 0.12 and 120.2 b 140.4# 140.4 n Occ Sensor
<br /> Tag (Btu/h) Condition Efficiency Unit Required per Design Efficiency Efficiency Unit Required per Design Efficiency
<br /> ('F) Tables 110.2 17 Total System Required Min OA CFM 784 18 Ventilation for this System Compiles? Yes
<br /> / Tables 110.2/ NA:7 day 'FOOTNOTES:System CFM should include both mechanical and natural ventilation for the zone/system
<br /> Title 20 Title 20 FLOOR PLAN Single zone <=25,000 ft' EMCS per 4 Hour Timer EMCS NA' NA:Alteration Project z y
<br /> 120 2 Alteration Air filtration requirements apply to the following three system types per§120.1(cj1A:space conditioning systems utilizing ducts to supply air to occupiable space;supply only
<br /> FLOOR PLAN <65,000 AFUE 0.80 0.8 SEER 13.0 15.2 -( ventilation systems providing outside air to occupiable space,-supply side of balanced ventilation systems including heat recovery and energy recovery ventilation systems providing
<br /> 'FOOTNOTES.Gravity gas wall heaters, gravity floor heaters,gravity room heaters,non-central eiectric heaters,fireplaces or decorative gas appliances,wood stoves are not required to outside air to occupiable space.
<br /> have setback thermostats.
<br /> Registration Number, Registration pate/TimRegistration Number.e: Registration Provider:Energysoft Registration Date/Time: Registration Provider:Energysoft Registration Number: Registration Date/Time: Registration Provider.Energysoft
<br /> CA Building Energy Efficiency Standards-2019 Nonresidential Compliance Report Version:2019.1.003 Report Generated:2020-09-15 18:16:53
<br /> CA Building Energy Efficiency Standards-2019 Nonresidential Compliance Report Version:2019.1.003 Report Generated:2020-09-15 18:16:53
<br /> CA Building Energy Efficiency Standards-2019 Nonresidential Compliance Report Version:2019.1.003 Report Generated:2020-09-15 18:16:53 Schema Version:rev 20190401
<br /> Schema Version:rev 20190401 Schema Version:rev 20190401
<br /> STATE OF CALIFORNIA STATE OF CALIFORNIA STATE OF CALIFORNIA
<br /> Mechanical Systems Mechanical Systems Mechanical Systems
<br /> NRCC-MCH-E CALIFORNIA ENERGY COMMISSION NRCC-MCH-E CALIFORNIA ENERGY COMMISSION NRCC-MCH-E CALIFORNIA ENERGY COMMISSION
<br /> CERTIFICATE OF COMPLIANCE NRCC-MCH-E CERTIFICATE OF COMPLIANCE NRCC-MCH-E CERTIFICATE OF COMPLIANCE NRCC-MCH-E
<br /> Project Name: RESTAURANT T.I. Report Page: (Page 5 of 9) Project Name: RESTAURANT T.I. Report Page: (Page 7 of 9) Project Name: RESTAURANT T.I. Report Page: (Page 8 of 9)
<br /> Project Address: 3081 N.TRACY BLVD. Date Prepared: 9/15/2020 Project Address: 3081 N.TRACY BLVD. bate Prepared: 9/15/2020 Project Address: 3081 N.TRACY BLVD. Date Prepared: 9/15/2020
<br /> 1.VENTILATION AND INDOOR AIR QUALITY O.DECLARATION OF REQUIRED CERTIFICATES OF ACCEPTANCE O.DECLARATION OF REQUIRED CERTIFICATES OF ACCEPTANCE
<br /> 3 uniform Mechanical Code may have more stringent ventilation requirements,the most stringent code requirement takes precedence. Selections have been made based on information provided in previous tables of this document.If any selection needs to be changed,please explain why in Table E Additional Remarks. 0 ♦ NRCA-MCH-19-A Occupancy Sensor Controls ❑ ❑
<br /> QSee Standards Tables 120.1-A and 120.1-B.
<br /> These documents must be provided to the building inspector during construction and can be found online at 0 • NRCA-MCH-20 Multi-Family Ventilation 1:1 El
<br /> For lecture halls with faxed seating,the expected number of occupants shall be shall be determined in accordance with the California building Code, https://www.energy_ca-gav/ti[1e24/2019standards/20.19 compliance documents/Nonresidential Documents/NRCA/ Field Inspector
<br /> d • NRCA-MCH-21 Multi-Family Envelope Leakage ❑ El6§120.2(e)3 requires systems serving rooms that are required by§130.1(c) Form/Title to have lighting occupancy sensing controls to also have occupancy sensing zone controls for ventilation. Yes No Pass Fail P.DECLARATION OF REQUIRED CERTIFICATES OF VERIFICATION
<br /> Examples of spaces which require lighting occupancy sensors include offices 250ft2 arsmaller, multipurpose rooms less than 1,000 ft;classrooms,conference rooms, restrooms,aisles NRCA-MCH-02-A-Outdoor Air must be submitted for all newt installed HVAC units.Note:MCH-02-A can b
<br /> and open areas in warehouses,library book stack aisles,corridors,stairwells,parking • � Y e performed in ❑ ❑ Selections have been made based on information provided in previous tables of this document.If any selection needs to be changed,please explain why in Tabic E Additional Remarks.
<br /> p g garages,and loading and unloading zones,unless excepted by 130.1 c. conjunction with MCH-07-A Supply Fan VFD Acceptance(if applicable)since testing activities overlap. These documents must be completed by a HERS Rater and provided to the building inspector during construction. The final documents must be created by a HERS Provider's registry,but
<br /> K.TERMINAL BOX CONTROLS • NRCA-MCH-03-A-Constant Volume Single,Zane HVAC NOTE:This form does not automatically move to"Yes'.If Constant Volume ❑ El can be found online at https://www.energy co.gov/title24/2019standards/2019 compliance documents/Nanresidential Documents/NRCV/
<br /> This section does not apply to this project.
<br /> Single Zone HVAC Systems are included in the scope,permit applicant should move this form to"Yes". Field Inspector
<br /> • (� NRCA-MCH-04--A-Air Distribution Duct Leakage ❑ ❑ Yes No Form/Title
<br /> L.DISTRIBUTION(DUCTWORK and PIPINGS • Pass Fail
<br /> NRCA-MCH-OS-A-Air Economizer Controls ❑ ❑ • n NRCV-MCH-04-H Duct Leakaage Test NOTE:Must be completed by a HERS Rater ❑ ❑
<br /> NBCA-MCH-06-A Demand Control Ventilation Systems must be submitted for all systems required to employ demand controlled Q • NRCV-MCH-24 Enclosure Air Leakaage Worksheet NOTE:Must be completed by a HERS Rater ❑ ❑
<br /> This table is used to show compliance with mandatory pipe insulation requirements found in 120.3 and prescriptive requirements found in§140.4(1) for duct leakage testing. • Q ventilation(refer to 120.1(03 3)can vary outside ventilation flow rates based on maintaining interior carbon dioxide(CO2) ❑ ❑
<br /> 0 • NRCV-MCH-27 High-rise Resdential NOTE:Must be completed by a HERS Rater
<br /> Duct Leakage Sealing concentration setpoints. ❑ ❑
<br /> • NRCA-MCH-07-A Supply Fan Variable Flow Controls
<br /> ❑ El • NRCV-MCH-32 Local Mechanical Exhaust NOTE:Must be completed by a HERS Rater ❑ ❑
<br /> M.COOLING TOWERS 0 • NRCA-MCH-08-A Valve Leakage Test El El Q.MANDATORY MEASURES DOCUMENTATION LOCATION
<br /> This section does not apply to this project. 0 • NRCA-MCH-09-A Supply Water Temperature Reset Controls ❑ ❑ This table is used to indicate where mandatory measures are documented in the plan set or construction documentation.
<br /> • NRCA-MCH-10-A Hydronic System Variable Flow Controls El El01N.DECLARATION OF REQUIRED CERTIFICATES 01=INSTALLATION U 1 • NRCA-MCH-11-A Automatic Demand Shed Controls 1:1 El02
<br /> Compliance with Mandatory Measures documented through MCH Yes Plan sheet or construction document location
<br /> Selections have been made based on information provided in previous tables of this document.if any selection needs to be changed,please explain why in Table EAdditiona!Remarks. • �) NRCA-MCH-12-A FDD for Packaged Direct Expansion Units ❑ ❑ Mandatary Measures Note Block M Sh
<br /> These documents must be provided to the building inspector during construction and can be found online at eets
<br /> hitps://www.energy.ca.gov/title24/2019standards/2019 compliance documents/Nanresidential Documents/NRC!/
<br /> C� • NRCA MCH-13 A Automatic FDD for Air Handling Units and Zone Terminal Units Acceptance ❑ ❑
<br /> t i • NRCA-MCH-14-A Distributed Energy Storage DX AC Systems Acceptance NOTE:This form does not automatically move to"Yes",If
<br /> Yes No Form/Title Field Inspector Distributed Energy System DX AC Systems are included in teh scope permit applicant should move this form to'Yes". ❑ ❑
<br /> Pass
<br /> • Fail NRCA-MCH-15-A Thermal Energy Storage(TES)System Acceptance NOTE:This form does not automatically move to"Yes".If
<br /> U NRCI-MCH-01 E-Must be submitted for all buildings ❑ ❑ Chilled water Storage,Ice-on-Coil Internal Melt,Ice-on-Coil External melt,Ice Harvester,Brine,Ice-Slurry,Eutecti Salt,Clathrate
<br /> • Hydrate Slurry(CHS),Cryogenic or Encapsulated(Ice Ball)Systems are included in the scope,permit applicant should move this 1711 11 0
<br /> form to'Yes".
<br /> Q • NRCA-MCH-16-A Supply Air Temperature Reset Controls ❑ ❑ / O
<br /> O • NRCA-MCH-17-A Condenser Water Temperature Reset Controls ❑ ❑ J C)
<br /> LO
<br /> • NRCA-MCH-18-A Energy Management Control Systems © ❑ (� `�
<br /> Registration Number: Registration Date/Time: Registration Number: Registration Date/Time: Re Registration Number: Registration Date/Time: Re Z
<br /> gistration Provider:Energysoft < f ,
<br /> Registration Provider:Energysoft
<br /> Registration provider:Energysoft v
<br /> CA Building Energy Efficiency Standards-2019 Nonresidential Compliance Report Version:2019,1.003 Report Generated:2020-09-15 18:16:53 ( ,
<br /> Efficiency Standards-2019 Nonresidential Compliance Report Version:2019.1.003 Report Generated:2020-09-15 18:16:53 Schema Version:rev 20190401 � V
<br /> CA Building Energy Efficiency Standards-2019 Nonresidential Compkiance Report Version:2019.1.OD3 Report Generated:2020-09-15 18:16:53 CA Building Energy E
<br /> Schema Version:rev 20190401
<br /> Schema Version:rev 20190401 w
<br /> � U
<br /> � ZQ
<br /> W tY
<br /> Of o ~
<br /> M
<br /> Q�o5 Essroti
<br /> Z
<br /> p. 1i35� z Date 9/15/2020Lu. a
<br /> (gr 30-21
<br /> *�9 FCG� `� Scale
<br /> OF C�+�1Fa �
<br /> Drawn 0
<br /> 1
<br /> gab # F20-791 RR Ijp
<br /> N
<br /> Sheet 2 U.
<br /> NON RESIDENTIAL
<br /> T24 SHEET
<br /> Of 4 Sheets
<br />
|