My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WP0041646
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
C
>
CARPENTER
>
2482
>
4200/4300 - Liquid Waste/Water Well Permits
>
WP0041646
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/14/2021 12:17:12 PM
Creation date
4/14/2021 10:23:25 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4200/4300 - Liquid Waste/Water Well Permits
RECORD_ID
WP0041646
PE
4372
STREET_NUMBER
2482
Direction
E
STREET_NAME
CARPENTER
STREET_TYPE
RD
City
STOCKTON
Zip
95205-
APN
17914018
ENTERED_DATE
1/26/2021 12:00:00 AM
SITE_LOCATION
2482 E CARPENTER RD
P_LOCATION
99
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\tsok
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
15
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Baja Exploration; David Hogan dba: <br />Endorsement Number: 37 <br />Any payments made under COVERAGE A for damages or under <br />COVERAGE C for medical expenses shall reduce the Designated <br />Construction Project General Aggregate Limit for that designated <br />construction project. Such payments shall not reduce the General <br />Aggregate Limit shown in the Declarations nor shall they reduce any <br />other Designated Construction Project General Aggregate Limit for any <br />other designated construction project shown in the Schedule above. <br />The limits shown in the Declarations for Each Occurrence, Fire Damage <br />and Medical Expense continue to apply. However, instead of being <br />subject to the General Aggregate Limit shown in the Declarations, such <br />limits will be subject to the applicable Designated Construction Project <br />General Aggregate Limit. <br />B. For all sums which the insured becomes legally obligated to pay as damages <br />caused by "occurrences" under COVERED A (SECTION I), and for all <br />medical expenses caused by accidents under COVERAGE C (SECTION I), <br />which cannot be attributed only to operations at a single designated <br />construction project shown in the Schedule above: <br />Any payments made under COVERAGE A for the damages or under <br />COVERAGE C for medical expenses shall reduce the amount available <br />under the General Aggregate Limit or the Products-Completed <br />Operations Aggregate Limit, whichever is applicable; and <br />Such payments shall not reduce any Designated Construction Project <br />General Aggregate Limit. <br />C. When coverage for liability arising out of the "products-completed <br />operations hazard" is provided, any payments for damages because of <br />"bodily injury" or "property damage" included in the "products-completed <br />operations hazard" will reduce the Products-Completed Operation Aggregate <br />Limit, and not reduce the General Aggregate Limit nor the Designated <br />Construction Project General Aggregate Limit. <br />D. If the applicable designated construction project has been abandoned, <br />delayed, or abandoned and then restarted, or if the authorized contracting <br />parties deviate from plans, blueprints, designs, specifications or timetables, <br />the project will still be deemed to be the same construction project. <br />E. The provisions of Limits Of Insurance (SECTION III) not otherwise <br />modified by this endorsement shall continue to apply as stipulated. <br />CG 25 03 03 97 <br /> Copyright, Insurance Services Office, Inc., 1996
The URL can be used to link to this page
Your browser does not support the video tag.