My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2021
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
M
>
MORADA
>
4219
>
2300 - Underground Storage Tank Program
>
PR0524617
>
COMPLIANCE INFO_2021
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/3/2022 4:08:14 PM
Creation date
4/14/2021 10:30:33 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2021
RECORD_ID
PR0524617
PE
2351
FACILITY_ID
FA0016523
FACILITY_NAME
AISLE 1 #2356
STREET_NUMBER
4219
Direction
E
STREET_NAME
MORADA
STREET_TYPE
LN
City
STOCKTON
Zip
95212
APN
12429017
CURRENT_STATUS
01
SITE_LOCATION
4219 E MORADA LN
P_LOCATION
01
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\kblackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
125
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
UNDERGROUNDSTORAGETANK <br /> RESPONSE PLAN - PAGE 1 (One form per facility) <br /> R0L <br /> TYPE OF ACTION ❑ I . NEW PLAN ® 2. CHANGE OF INFORMATION <br /> I. FACILITY INFORMATION <br /> FACILITY ID # (Agency Use Onl)) <br /> BUSINESS NAME (Same as FACILITY NAME) Roz <br /> Aisle 1 Store #2356 <br /> BUSINESS SITE ADDRESS R03 . CITY R04. <br /> 4219 E . Morada Lane Stockton <br /> II , SPILL CONTROL AND CLEANUP METHODS <br /> This plan addresses unauthorized releases from UST systems and supplements the emergency response plans and procedures in the facility's Hazardous Materials Business <br /> Plan. <br /> ➢ If safe to do so, facility personnel will take immediate measures to control or stop any release (e.g. , activate pump shut-off, etc.) and, if necessary, safely remove <br /> remaining hazardous material from the UST system <br /> > Any release to secondary containment Will be pumped or otherwise removed within a time consistent with the ability of the secondary containment system to contain <br /> the hazardous material , but not greater than 30 calendar days, or sooner if required by the local agency. Recovered hazardous materials, unless still suitable for their <br /> intended use, will be managed as hazardous waste. <br /> ➢ Absorbent material will be used to contain and clean up manageable spills of hazardous materials. Absorbent material may be reused until it becomes too saturated <br /> to be effective. It will then be managed properly. Used absorbent material , reusable or waste, will be stored in a properly labeled and sealed container <br /> ➢ Facility personnel will determine whether or not any water removed from secondary containment systems, or from clean-up activity, has been in contact with any <br /> hazardous material . If the water is contaminated, it will be managed as hazardous waste. If the water has a petroleum sheen ( i .e. , rainbow colors), it is contaminated. <br /> A thick floating petroleum layer may not necessarily display rainbow colors. Water (hazardous or non-hazardous) from sumps, spill containers, etc. will not be <br /> disposed to storm water systems. <br /> ➢ We will review secondary containment systems for possible deterioration if any of the following conditions occur. <br /> I . Hazardous material in contact with secondary containment is not compatible with the material used for secondary containment; <br /> 2 . Secondary containment is prone to damage from any equipment used to remove or clean up hazardous material collected in secondary containment; <br /> 3 . Hazardous material, other than the product/waste stored in the primary containment system, is placed inside secondary containment to treat or neutralize released <br /> product/waste, and the added material or resulting material from such a combination is not compatible with secondary containment. <br /> III. SPILL CONTROL AND CLEAN-UP EQUIPMENT <br /> PERIODIC niAINTENANCE : Spill control and clean-up equipment kept permanently on-site is listed in the facility's Hazardous Materials Business Plan. This <br /> equipment is inspected at least monthly, and after each use, and supplies are replenished as needed. Defective equipment is repaired or replaced as necessary. <br /> EQUIPMENT NOT PERMANENTLY ON-SITE, BUT AVAILABLE FOR USE IF NEEDED* <br /> (Complete nly if applicable) <br /> EQUIPMENT LOCATION AVAILABILITY <br /> RIO. 1120, R30. <br /> RI1 . R21 . R31 . <br /> RI2. R22. R32. <br /> RI3 . R23 . R33 , <br /> RI4 . R24. R34. <br /> RIS. R25, R35. <br /> IV. RESPONSIBLE PERSONS <br /> THE FOLLOWING PERSON(S) IS/ARE RESPONSIBLE FOR AUTHORIZING ANY WORK NECESSARY UNDER THIS RESPONSE PLAN : <br /> NAME Roo, TITLE 1150. <br /> Chittal Shah Maintenance Manager <br /> NAME R41 TITLE R51 . <br /> Grant Zech COO <br /> NAME RQ2 TITLE R52. <br /> NAME R43 TITLE R53. <br /> V. MONITORING INDICATORS <br /> IF MONITORING INDICATES A POSSIBLE UNAUTHORIZED RELEASE, STEPS TO VERIFY THE RELEASE WILL BE MADE AS FOLLOWS : <br /> ® Additional system testing or data collection ® Inspection by qualified persons ❑ Recalibration of equipment <br /> ❑ Other: <br />
The URL can be used to link to this page
Your browser does not support the video tag.