My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
T
>
THORNTON
>
26056
>
2900 - Site Mitigation Program
>
PR0545730
>
SITE INFORMATION AND CORRESPONDENCE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/14/2021 12:56:54 PM
Creation date
4/14/2021 12:42:26 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
SITE INFORMATION AND CORRESPONDENCE
RECORD_ID
PR0545730
PE
2957
FACILITY_ID
FA0005194
FACILITY_NAME
DONNA GARDNER
STREET_NUMBER
26056
STREET_NAME
THORNTON
STREET_TYPE
RD
City
THORNTON
Zip
95686
APN
00115046
CURRENT_STATUS
02
SITE_LOCATION
26056 THORNTON RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\tsok
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
286
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
The Supply Well boring log indicates sandy soils exist to a depth of 60 feet bgs where a 35-foot <br />thick clay/shale layer was encountered from 60 to 94 feet bgs. Beneath the clay/shale layer, sand <br />was observed from 94 to 98 feet bgs. For estimating purposes, we have assumed the conductor <br />casing would be set at 65 feet bgs and the well will be completed at a depth of 98 feet bgs. The <br />actual completion depths of this well will be determined based on lithology encountered in the <br />field. The deeper boring would be continuously cored beginning at approximately 30 feet bgs to <br />the final completion depth to reduce the risk of cross contaminating water bearing formations. <br />PHS/EHD written concurrence with the ideology of employing the use of a conductor casing for <br />the construction of the proposed deeper monitoring well screen is requested to obtain pre- <br />approval from the State Water Resources Control Board Cleanup Fund for the proposed work. <br />If you have any questions regarding this proposal or need additional information please call our <br />office at (209) 579-2221. <br />Sincerely, <br />Smith Technology Corporation <br />Tom J. Lutterman <br />Project Geologist <br />-41-0-71A-11-12V <br />Jeanne Homsey, P.E. <br />California Registered Civil Engineer C47410 <br />Attachments <br />cc: Martin Clark, SWRCB <br />Donna Santini-Gardner <br />w:\94326\letters\cap_add.doc <br />2 <br />SIAM
The URL can be used to link to this page
Your browser does not support the video tag.