My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2021
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
Y
>
YOSEMITE
>
1257
>
2300 - Underground Storage Tank Program
>
PR0231463
>
COMPLIANCE INFO_2021
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/1/2021 11:03:57 AM
Creation date
4/19/2021 9:07:53 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2021
RECORD_ID
PR0231463
PE
2361
FACILITY_ID
FA0003707
FACILITY_NAME
AHMEDS SONS INC
STREET_NUMBER
1257
Direction
W
STREET_NAME
YOSEMITE
STREET_TYPE
AVE
City
MANTECA
Zip
95336
APN
20015015
CURRENT_STATUS
01
SITE_LOCATION
1257 W YOSEMITE AVE
P_LOCATION
04
P_DISTRICT
003
QC Status
Approved
Scanner
SJGOV\kblackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
112
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SAN J U A Q U I N Environmental Health Department <br /> COUNTY <br /> Underground Storage Tank Program Inspection Report <br /> Facility Name: Facility Address: Date: <br /> AHMEDS SONS INC 1257 W YOSEMITE AVE, MANTECA April 28, 2021 <br /> SUMMARY OF VIOLATIONS <br /> (CLASS I,CLASS II,or MINOR-Notice to Comply) <br /> Item# Remarks <br /> 122 CCR 2712(f)Failure to implement corrections and submit written response within 30 days of receiving the report. <br /> OBSERVATION:An inspection was last done on 04/20/2020 and an inspection report was issued identifying <br /> information to be submitted to bring this site into compliance. This information was required to be submitted by <br /> 05/20/2020. This information was received on 12/09/2020 , seven months late resulting in a non-compliant status <br /> for this facility. <br /> REGULATION GUIDANCE:An operator that receives an inspection report shall have 30 days to implement the <br /> corrections specified in the inspection report and comply with permit conditions. The corrective action shall include <br /> all of the recommendations made in the report. The operator shall submit a written response that includes a <br /> statement documenting corrective actions taken or proposing corrective actions which will be taken. <br /> CORRECTIVE ACTION: Ensure that a written response documenting corrective actions taken or proposed is <br /> submitted and all corrections implemented within 30 days of receiving an inspection report. <br /> This is a Class II violation. <br /> 203 CCR 2712(b)(1-2)Failure to maintain monitoring records for 36 months and maintenance records for 60 months. <br /> OBSERVATION: Maintenance and monitoring records for the last three years were not found on site. <br /> -The 2020 monitoring system certification test results were not on site during the inspection <br /> -The 03/10/2019 Overfill prevention test results were not on site during the inspection. <br /> REGULATION GUIDANCE: These records shall be maintained on site for at least three years. Monitoring records <br /> include: (1)date and time of all monitoring or sampling; (2)monitoring equipment calibration and maintenance <br /> records; (3)results of any visual observations; (4)results of sample analysis performed a lab or in the field; (5)logs <br /> of all readings of gauges or other monitoring equipment, ground water elevations, or other test results; (6)results of <br /> inventory readings and reconciliations. <br /> CORRECTIVE ACTION: Immediately locate and maintain all missing maintenance and monitoring records for the <br /> last three years on site and submit copies to the EHD. <br /> This was corrected on site. <br /> This is a minor violation. <br /> 319 CCR 2635, 2637.2,2665, 2712 Failure to comply with overfill prevention equipment requirements. <br /> OBSERVATION: Overfill prevention testing was conducted on 3/10/2019.The overfill prevention test results include <br /> incorrect and missing information, pass or fail not stated.. <br /> REGULATION GUIDANCE: Overfill prevention equipment inspections were required to be conducted by October <br /> 13, 2018, and every 36 months thereafter, and within 30 days of completion of a repair. <br /> CORRECTIVE ACTION: Ensure all future testing is conducted within required time frame. <br /> This is a repeat violation, Class II. <br /> FA0003707 PR0231463 SCO01 04/28/2021 <br /> EHD 23-01 Rev.9/16/2020 Page 5 of 6 Underground Storage Tank Program OIR <br /> 1868 E. Hazelton Avenue I Stockton, California 95205 1 T 209 468-3420 1 F 209 464-0138 1 www.sjgov.org/EHD <br />
The URL can be used to link to this page
Your browser does not support the video tag.