My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2021
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
W
>
WATERLOO
>
3300
>
2300 - Underground Storage Tank Program
>
PR0231765
>
COMPLIANCE INFO_2021
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/24/2022 2:25:35 PM
Creation date
4/19/2021 9:17:34 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2021
RECORD_ID
PR0231765
PE
2361
FACILITY_ID
FA0003600
FACILITY_NAME
Nella Oil #427
STREET_NUMBER
3300
STREET_NAME
WATERLOO
STREET_TYPE
Rd
City
Stockton
Zip
95205
CURRENT_STATUS
01
SITE_LOCATION
3300 Waterloo Rd
P_LOCATION
99
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\kblackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
131
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
S A J O A Q U I N Environmental Health Department <br />COUNTY <br />UST SYSTEM RETROFIT OR REPAIR <br />(Submit minimum of 3 sets of plans & applications as originals will be retained by EHD) <br />f. Site map enclosed? YES [I NO(] <br />2. Submit copies of lCC Service Technician and/or Installer's certificate and all manufacturer training <br />certificates for each person installing or testing any component that Is repaired or replaced. Ensure a copy of <br />the 'Site Health and Safety Plan$ is available on the jobsite as required by Title 8. <br />3. Detailed description of work to be completed. List components to be repaired or replaced and attach a <br />diagram drawn to scale showing location of repairs and/or replacements. If repairing a component, describe <br />how this will be done. (If adding piping. UDC's, or other UST equipment, or performing tank top upgrade, <br />use the LUST Installation Application pages 4-8 as necessary for a timely pian review): <br />Replaced the 87 leak detector with like for like equipment. <br />4. List of equipment to be used (Attach manufacturer's specification sheets showing third -party approval): <br />Vaporiess LD2000 Mechanical Leak Detector <br />5. Decontamination Procedures: <br />a. Will piping be decontaminated prior to removal? YES [ j NO [ j <br />b. Identify contractor performing decontamination: <br />Name Phone U_ <br />Address <br />3of6 <br />city I zip <br />
The URL can be used to link to this page
Your browser does not support the video tag.