Laserfiche WebLink
Underground Storage Tank <br /> Designated UST Operator Visual Inspection Report <br /> 5. OWNER/OPERATOR DESCRIPTION OF FOLLOW=UP ACTION <br /> Number the follow up actions to correspond to appropriate compliance issues from Section 3 . <br /> NONE <br /> 6. OWNER / OPERATOR ACKNOWLEDGEMENT OF INSPECTION RESULTS <br /> have reviewed the results of the designated UST operator inspection report and provided a <br /> description of the action (s) taken or to be taken to correct any compliance issues discovered . <br /> Name of UST Owner / Operator (print) <br /> � K cla �j ;sszll <br /> UST Owner/Operator Signature Date Signed <br /> 5 - 1 — Z I <br /> 7. INSPECTION HISTORY <br /> Has each follow-up action of Section 3 from the previous Designated UST Yes No NA <br /> Operator Inspection Report been completed appropriately? ❑ E <br /> Attach documentation verifying appropriate service to this re ort. <br /> 8. RELEASE DETECTION ALARM HISTORY <br /> Attach a copy of the alarm history report/log to this report. Yes No NA <br /> Is the monitoring system powered on and in proper operating mode? ® ❑ <br /> Has each alarm since the previous inspection been responded to appropriately? ® ❑ ❑ <br /> (Attach documentation verifying appropriate service to this report.) <br /> Have all containment sumps , that have had an alarm since the previous ® ❑ ❑ <br /> designated UST operator inspection report, been responded to by a qualified <br /> service technician? <br /> 9 . UST SYSTEM INSPECTION <br /> All answers marked `No" must be described by the designated UST operator in Section 3. <br /> Page 2 of 4 <br />