My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2021
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
W
>
WATERLOO
>
3300
>
2300 - Underground Storage Tank Program
>
PR0231765
>
COMPLIANCE INFO_2021
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/24/2022 2:25:35 PM
Creation date
4/19/2021 9:17:34 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2021
RECORD_ID
PR0231765
PE
2361
FACILITY_ID
FA0003600
FACILITY_NAME
Nella Oil #427
STREET_NUMBER
3300
STREET_NAME
WATERLOO
STREET_TYPE
Rd
City
Stockton
Zip
95205
CURRENT_STATUS
01
SITE_LOCATION
3300 Waterloo Rd
P_LOCATION
99
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\kblackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
131
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Underground Storage Tank <br />Secondary Containment Testing Report Form <br />6. TANK SECONDARY CONTAINMENT TEST <br />Test Method Developed by 0 Manufacturer E] Industry Standard © Professional Engineer <br />Test Type 0 Pressure ❑ Vacuum ❑Q Hydrostatic <br />Test Equipment Used: <br />Tank ID <br />Tank Manufacturer <br />Tank Capacity <br />Test Start Time <br />Initial Reading <br />Test End Time <br />Final Reading <br />Change in Reading <br />Pass/Fail Criteria <br />Tightness Test Results <br />0 Pass 0 Fail <br />0 Pass Fail <br />0 Pass 0 Fail <br />❑ Pass C Fail <br />7. PIPE SECONDARY CONTAINMENT TEST <br />Test Method Developed by Manufacturer © Industry Standard © Professional Engineer <br />Test Type © Pressure 0 Vacuum © Hydrostatic <br />Test Equipment Used: <br />Pipe Run ID <br />Pipe Manufacturer <br />Test Start Time <br />Initial Reading <br />Test End Time <br />Final Reading <br />Change in Reading <br />Pass/Fail Criteria <br />Tightness Test Results <br />© Pass © Fail <br />© Pass 0 Fail <br />I ❑] Pass Ij Fail <br />❑ Pass ® Fail <br />Pipe Run ID <br />Pipe Manufacturer <br />Test Start Time <br />Initial Reading <br />Test End Time <br />Final Reading <br />Change in Reading <br />Pass/Fail Criteria <br />Tightness Test Results <br />0 Pass 0 Fail <br />C Pass r] Fail <br />I 0 Pass ❑ Fail <br />C Pass 0 Fail <br />Additional copies of this page may be attached. <br />All tests marked "Fail" and any repairs made before or during the tightness test must be described in <br />the COMMENTS section. <br />Page 2 of 5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.