Laserfiche WebLink
Consolidated Forward Landfill Project-Mitigation Monitoring and Reporting <br /> Program Checl<Iiti1 <br /> Page 2.4 <br /> �IiUt�ulion nl •asnme tumpleneenlultonlugdemucnlalluo <br /> Monitoring tbufirmali(m Comments <br /> MITIGATION MONITORING AND REPORTING PROGRAM CHECKLIST <br /> INTRODUC"PION: <br /> This Mitigation Monitoring and Reporting Program Checklist includes mitigation measures identified in this EIR,as well as mitigation measures from three <br /> previous EIRs prepared for the project site,identified below as Forward 1993", Austin 1994",and "Austin 2000". These three previous EIRs are discussed in <br /> more detail in the introduction to Attachment I Mitigation Measures,above. <br /> Mitigation measures are grouped by, the impact categories used in this EIR,and numbered sequentially. <br /> ation <br /> Mitigation Moasures from this EIR are printed in normal font,with the original Mitigation Measure numbers from this FIR followingin pare <br /> 40 <br /> measures from the three previous EIRs are printed in italics and identified by their source(forward 1993, Austin 1994,or Austin 2000), followedbythe M ligation <br /> Measure number in the relevant EIR. Because some impacts in this EIR and in previous FIRS do not require mitigation measures, the original mitigation measure <br /> numbers are not sequential. <br /> In some cases, mitigation measures from two or more of the previous EIRs that are substantially similar in content,or have been updated without otherwise being <br /> changed, have been combined. These mitigation measures are identified as similar and/or"updated". Mitigation measures from the three previous EIRs that <br /> have been replaced by equivalent measures in this EIR,or have already been implemented,are excluded from the list below. <br /> A. I,AND USE, I'I,ANS, <br /> ANI) 1't)1,It Irs <br /> I (A.3) Bird I la•r.nrds <br /> Conlinue existing Responsibility: Landfill operator Responsibility: San Joaquin County <br /> bird control measures 'Timing: Ongoing <br /> Environmental licalth Department <br /> Timing: During monthly site visits <br /> Limit surface of'ponds Responsibility: Landfill operator Responsibility: RWQCB <br /> Timing:The area of proposed and 'riming: Prior to approval of Waste <br /> existing ponds shall be shown on any Discharge Requirements(W Dlzs) <br /> grading permits submitted to the <br /> County <br /> Bird survey Responsibility: Landfill operator Responsibility: San Joaquin County <br /> Timing:Upon approval of Use Permit Environmental health Department <br /> and prior to 9pproval of business license Timing: Prior to approval of <br /> business license <br />