Laserfiche WebLink
Consolidated Forward Landfill Project-Mitigation Monitoring and Reporting Program Checklist <br /> Page 27 <br /> Implementation <br /> Monitoring Conlirmation Comments <br /> Mitigation Measure implementation <br /> r Responsibility: Landfill operator Responsibility:Stitt Joaquin Caftnty <br /> 7 Forward /993 3 (E3) Com►matity Development Drpor•hneul <br /> SO1IFf(l►wall at 9690 Timing: If and when requested Timin 1 and when requesled <br /> Austin Road b f <br /> c< <br /> Responsibility: Landfill operator Responsibility:San Joaquin County <br /> 8 F•orrvard /993 (EI) p Community Development Department <br /> Quietest available Timing: Ongoing Timing:Annually and on a c•omplclinl <br /> Equipment basis <br /> Landfill operator Responsibility:San Joaquin County <br /> 9 l�or•ward 1993 (E2) <br /> Responsibility l� p <br /> Conuninfily Development Depcu!►nc•rf► <br /> Maintain MU/11ers Timing: Ongoing Timing:Annually and orf rr complainl <br /> basis <br /> 10 Austin 1994 (lll.o) (similaf), Austin 2000(HI.a) Responsibility:San.loaquin Cntln(y <br /> Conlornf in Cofafly Rt.spcnfsibility: Landfill operator P <br /> C-u►mrurnity l>errlolmuvfl 01•parhnrvrl <br /> noisy shuuhrr•ds Timinl;: Ongoing Timing: Arnnurlly, and on it coroplront <br /> basis <br /> l/ Arcelirf 1994 (I//.b), Austin 2000(/11.6) Res onsibilily:San.lonquin Cofa14 <br /> Setbacks and limits Responsibility: /.anditll operator P <br /> C <br /> Timin� Ongoing n►nnnrni{v t)evcloprncnl I h•pfo•hncnl <br /> on hours I•' g g 77111illp. ;I nmufl/I" and on rr corrfplmnl <br /> Alit UALI.1'Y ODORS Joaquin Valle <br /> D. A � � Responsibility: San Jo. 1 Y <br /> 12(D.2)Landfill gas recovery Responsibility:Landfill operator P <br /> at forward Landfill 'riming:As determined by SJVAPCD Air Pollution Control District <br /> Timing:Quarterly monitoring of gas <br /> all sources exceeds 150 cfm) <br /> (before gas release rate from release rate; implement wl►cu gas release <br /> rate from all sources exceeds 150 ctn► <br /> Responsibility: San Joaquin Valley <br /> 13 (D.4)Dust control Responsibility:Landfill operator P <br /> Operational rueasures Finning:`throughout life of project Air Pollution Cimtrni District <br /> Timing:(Quarterly <br /> I hist ci►i►Irul(all Itesponyihility: landfill operator Responsibility: tiara.Irniquuf Valley <br /> �J <br />