Laserfiche WebLink
6 0 Page 1 of 1 <br />Natalia Subbotnikova [EH] <br />From: <br />Joyesh Chandra [Jchandra@sjgov.org] <br />Sent: <br />Monday, November 26, 2007 3:02 PM <br />To: <br />Natalia Subbotnikova [EH]; Michael Kith [EH] <br />Cc: <br />Michael Carroll <br />Subject: Dec 4th -Soil Gas Monitoring Well Inst @ FH & CH <br />Importance: High <br />Solid Waste Division's Drilling contractor, Cascade Drilling Inc, will start installing Soil Gas Monitoring Wells at <br />our Foothill and Corral Hollow Landfill. The contractor will begin work at Foothill Sanitary Landfill first on <br />December 4th installing SG 110 & SG 120. <br />Once the work has been completed, the contractor will move to Corral Hollow to install GW -1A soil gas monitoring <br />well. The respected Inspector of the site will be notified of this move minimum of two days before the move. <br />One well will be drilled and installed at a time and then another well will be drilled <br />The driller has informed me that to drill a well to our specified depth may take more than half a day depending on <br />the soil formation. <br />The driller has indicated that they may be ready to install the first well G 120 around 2.00 pm on the first day <br />December 4th at Foothill Sanitary Landfill. The inspection schedule for the next well will be notified by the driller <br />the next day. <br />Please let me know if you need any additional information. <br />Thanks <br />Joyesh J Chandra <br />San Joaquin County <br />Department Of Public Works <br />Solid Waste Division <br />PH -(209) 468-3066 <br />FAX -(209)468-3078 <br />jchandra@sigov.org <br />11/26/2007 <br />