Laserfiche WebLink
'r ' Page 1 of 2 <br />From: <br />Joyesh Chandra [Jchandra@sjgov.org] <br />Sent: <br />Friday, November 30, 2007 7:53 AM <br />To: <br />Natalia Subbotnikova [EH]; Michael Kith [EH] <br />Cc: <br />Michael Carroll <br />Subject: Dec 4th -Soil Gas Monitoring Well Inspection CANCELLATION <br />Importance: High <br />Mike <br />The initial start date work at Foothill Sanitary Landfill for the installation of Soil Gas Monitoring <br />Wells on Dec 4th has been cancelled. The work cancellation is due to unavailability of some <br />parts that the driller had ordered. Solid Waste Division will notify EHD minimum of two days in <br />advance with the next work start date. <br />Joyesh J Chandra <br />San Joaquin County <br />Department Of Public Works <br />Solid Waste Division <br />PH -(209) 468-3066 <br />FAX -(209)468-3078 <br />jcha_ndra*sjgov.o_ rg <br />-----Original Message ----- <br />From: Joyesh Chandra <br />Sent: Monday, November 26, 2007 3:02 PM <br />To: 'Natalia Subbotnikova (nsubbotnikova@sjcehd.com)'; 'mkith@sjcehd.com' <br />Cc: Michael Carroll <br />Subject: Dec 4th -Soil Gas Monitoring Well Inst @ FH & CH <br />Importance: High <br />Solid Waste Division's Drilling contractor, Cascade Drilling Inc, will start installing Soil Gas Monitoring <br />Wells at our Foothill and Corral Hollow Landfill. The contractor will begin work at Foothill Sanitary Landfill <br />first on December 4th installing SG 110 & SG 120. <br />Once the work has been completed, the contractor will move to Corral Hollow to install GW -1A soil gas <br />monitoring well. The respected Inspector of the site will be notified of this move minimum of two days <br />before the move. <br />One well will be drilled and installed at a time and then another well will be drilled <br />The driller has informed me that to drill a well to our specified depth may take more than half a day <br />depending on the soil formation. <br />The driller has indicated that they may be ready to install the first well (SG 120) around 2.00 pm on the <br />first day December 4th at Foothill Sanitary Landfill. The inspection schedule for the next well will be <br />notified by the driller the next day. <br />Please let me know if you need any additional information. <br />Thanks <br />Joyesh J Chandra <br />San Joaquin County <br />Department Of Public Works <br />11/30/2007 <br />