My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CORRESPONDENCE_2008 (7/08 TO 12/08)
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
C
>
CORRAL HOLLOW
>
31130
>
4400 - Solid Waste Program
>
PR0440003
>
CORRESPONDENCE_2008 (7/08 TO 12/08)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/27/2021 2:39:24 PM
Creation date
4/20/2021 1:14:15 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
CORRESPONDENCE
FileName_PostFix
2008 (7/08 TO 12/08)
RECORD_ID
PR0440003
PE
4434
FACILITY_ID
FA0003698
FACILITY_NAME
CORRAL HOLLOW LANDFILL
STREET_NUMBER
31130
STREET_NAME
CORRAL HOLLOW
STREET_TYPE
RD
City
TRACY
Zip
95376
APN
25303010
CURRENT_STATUS
01
SITE_LOCATION
31130 CORRAL HOLLOW RD
P_LOCATION
99
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\cfield
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
212
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Page 1 of 1 <br />Natalia Subbotnikova [EH] <br />From: Joyesh Chandra [Jchandra@sjgov.org] <br />Sent: Tuesday, July 08, 2008 2:28 PM <br />To: Natalia Subbotnikova [EH] <br />Cc: Robert McClellon [EH]; Michael Carroll; Jaime Perez; Billy Baier <br />Subject: CH -Work Completion Update <br />Attachments: CH -GW -3 -Well Enclosure Fix.jpg; Corral Hollow NE Drainage Ditch Cleaned-3.jpg; Corral <br />Hollow NE Drainage Ditch Cleaned.jpg; Corral Hollow NE Drainage Ditch Cleaned-2.jpg; <br />Corral Hollow NE Drainage Ditch Cleaned-1.jpg <br />ma - <br />Per <br />Per your last inspection on June 18th at our Corral Hollow Sanitary Landfill with Gino Yetka, <br />we have completed the following work tasks as discussed. <br />1) Cleaning the North Eastern drainage ditch (Along Interstate 580). Overgrown <br />vegetation in the drainage ditch was removed and erosion mats re -aligned to ensure <br />proper drainage. See attached pictures. <br />2) Making the probes of soil gas monitoring well GW -3 accessible. The well enclosure of <br />GW -3 was lowered for easy access to the monitoring probes. See attached picture. <br />3) Cleaning the drainage ditch by the water tank. Rough spots in the invert of the <br />drainage ditch was smoothed. <br />Please let me know if you need any additional information about the work tasks completed. <br />Thanks <br />JOYESH J CHANDRA <br />SAN JOAQUIN COUNTY <br />DEPARTMENT OF PUBLIC WORKS <br />SOLID WASTE DIVISION <br />1810 E. HAZELTON AVE <br />STOCKTON, CA 95201 <br />PH -(209)468-3066 <br />FAX -(209)468-3078 <br />mailto:jchandra@sigov.org <br />7/8/2008 <br />
The URL can be used to link to this page
Your browser does not support the video tag.