Laserfiche WebLink
i 1 0 0 Page 2 of 3 <br />Sent: Tuesday, July 08, 2008 3:00 PM <br />To: Joyesh Chandra <br />Subject: RE: CH -Work Completion Update <br />Thanks Joyesh. <br />How about depression on the northwest side of the road? <br />From: Joyesh Chandra [mailto:Jchandra@sjgov.org] <br />Sent: Tuesday, July 08, 2008 2:28 PM <br />To: Natalia Subbotnikova [EH] <br />Cc: Robert McClellon [EH]; Michael Carroll; Jaime Perez; Billy Baier <br />Subject: CH -Work Completion Update <br />Hello Natalia <br />Per your last inspection on June 18th at our Corral, Hollow Sanitary Landfill with <br />Gino Yetka, we have completed the following work tasks as discussed. <br />1) Cleaning the North Eastern drainage ditch (Along Interstate 580). <br />Overgrown vegetation in the drainage ditch was removed and erosion mats <br />re -aligned to ensure proper drainage. See attached pictures. <br />2) Making the probes of soil gas monitoring well GW -3 accessible. The we[[ <br />enclosure of GW -3 was lowered for easy access to the monitoring probes. <br />See attached picture. <br />3) Cleaning the drainage ditch by the water tank. Rough spots in the invert <br />of the drainage ditch was smoothed. <br />Please let me know if you need any additional information about the work tasks <br />completed. <br />JOYESH J CHANDRA <br />SAN JOAQUIN COUNTY <br />DEPARTMENT OF PUBLIC WORKS <br />SOLID WASTE DIVISION <br />1810 E. HAZELTON AVE <br />STOCKTON, CA 95201 <br />PH -(209)468-3066 <br />FAX -(209)468-3078 <br />rnailt-ojch-a-nd ra-@sjgo .qrg, <br />7/11/2008 <br />