Laserfiche WebLink
Mr. Michael Elmore -2- <br />EASEMENT ENCROACHMENT— CORRAL HOLLOW SANITARY LANDFILL CLOSURE CAP <br />EXTENSION <br />Shell Oil will be notified a minimum of two weeks before the start of construction start. All <br />excavation work will be done in the presence of Shell Oil representatives. We anticipate this <br />project will occur in the spring and summer of 2009. <br />If you need additional information or have any concerns, please call Joyesh Chandra, Engineer <br />II, at (209) 468-3066. <br />Sincerely, <br />W. MICHAEL CARROLL, PE <br />Senior Civil Engineer <br />WMC:sc <br />NA1Corral Hollow\ClosureCover\CloCapExtn\MElmoreOl-ShellEasement.doc <br />Attachments <br />c: (Via Email) Robert McClellon, Environmental Health Department <br />Todd Del Frate California Regional Water Quality Control Board <br />Michael B. Wochnick, CIWMB Closure and Technical Services <br />Julia Gillette, San Joaquin County Public Works <br />LA 21850 <br />