My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CORRESPONDENCE_2008 (7/08 TO 12/08)
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
C
>
CORRAL HOLLOW
>
31130
>
4400 - Solid Waste Program
>
PR0440003
>
CORRESPONDENCE_2008 (7/08 TO 12/08)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/27/2021 2:39:24 PM
Creation date
4/20/2021 1:14:15 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
CORRESPONDENCE
FileName_PostFix
2008 (7/08 TO 12/08)
RECORD_ID
PR0440003
PE
4434
FACILITY_ID
FA0003698
FACILITY_NAME
CORRAL HOLLOW LANDFILL
STREET_NUMBER
31130
STREET_NAME
CORRAL HOLLOW
STREET_TYPE
RD
City
TRACY
Zip
95376
APN
25303010
CURRENT_STATUS
01
SITE_LOCATION
31130 CORRAL HOLLOW RD
P_LOCATION
99
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\cfield
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
212
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Construction Quality Assurance A)Plan 46 Extension of Closure Cap <br /> Corral Hollow Sanitary Landfill August 21,2008 <br /> 2.2 Responsibilities of Construction Quality Assurance Staff <br /> 2.2.1 Communications with the Contractor <br /> Only the individuals authorized by the Owner may communicate with the Contractor. <br /> Communications of an official nature must be clear, direct, and professional. When <br /> written communications are required, they must be documented on the appropriate <br /> forms. Formal letters to the Contractor will be issued by the Owner. <br /> 2.2.2 Communications with the Owner <br /> All communications must be through proper channels as defined in the project <br /> organization chart or as requested by the Owner. Communications of an official nature <br /> must be written, be clear, direct, and professional. <br /> 2.2.3 Qualifications of the Contractor <br /> The Contractor shall provide documentation regarding the experience of the company <br /> and work crew as specified in the specifications. <br /> 2.2.4 Responsibilities/Qualifications of the CQA Manager <br /> The CQA Manager administers the construction quality assurance program. CQA <br /> procedures and reports must be reviewed by the CQA Manager for compliance with the <br /> project CQA Plan. The CQA Manager acts as an auditor to verify and document the <br /> proper and complete implementation of the CQA program. The CQA Manger shall <br /> audit the project a minimum of three times during construction. The CQA Manager <br /> has authority to identify deficiencies and implement corrective action to the CQA <br /> program. The CQA Manager collects, distributes, and addresses disposition of <br /> Contractor submittals approved by the design engineer(s). The CQA Manager <br /> coordinates testing with independent testing laboratories and maintains record <br /> drawings. The CQA Manager reports directly to the construction manager. The CQA <br /> Manager will write the final construction report (FCR) under the direction of the CQA <br /> Vector Engineering, Inc. .143E Spring Hill Drive*Grass Valley, CA• (530) 272-2448 <br /> -8- <br />
The URL can be used to link to this page
Your browser does not support the video tag.