My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CORRESPONDENCE_2008 (7/08 TO 12/08)
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
C
>
CORRAL HOLLOW
>
31130
>
4400 - Solid Waste Program
>
PR0440003
>
CORRESPONDENCE_2008 (7/08 TO 12/08)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/27/2021 2:39:24 PM
Creation date
4/20/2021 1:14:15 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
CORRESPONDENCE
FileName_PostFix
2008 (7/08 TO 12/08)
RECORD_ID
PR0440003
PE
4434
FACILITY_ID
FA0003698
FACILITY_NAME
CORRAL HOLLOW LANDFILL
STREET_NUMBER
31130
STREET_NAME
CORRAL HOLLOW
STREET_TYPE
RD
City
TRACY
Zip
95376
APN
25303010
CURRENT_STATUS
01
SITE_LOCATION
31130 CORRAL HOLLOW RD
P_LOCATION
99
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\cfield
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
212
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Construction Quality Assurance$*A) Plan Extension of Closure Cap <br /> Corral Hollow Sanitary Landfill August 21,2008 <br /> 2.3.5 Processing P Test Reports <br /> A test report must be completed by the CQA Monitors whenever testing is performed. <br /> The test reports must be reviewed by the CQA Manager. The review includes a check <br /> for mathematical accuracy, conformance to test requirements, conformance to <br /> specifications, and for clarity, legibility, traceability, and completeness. The review <br /> must be evidenced by a signature of the reviewer. Test reports (or summaries) from <br /> independent testing laboratories will also be transmitted to the CQA Manager for <br /> review. <br /> 2.3.6 Processing Project Records <br /> Project records are completed as needed. Use of the project records is limited to the <br /> scope for which they are intended. The record must be completed by filling in all of the <br /> blanks provided on the form, followed by the signature of the individual completing the <br /> form. All project records must be maintained at the site. <br /> 2.4 Documentation and Control of Non-Conformance <br /> 2.4.1 Observation of Non-Conformance <br /> Whenever a non-conformance is discovered or observed in the construction process, <br /> product, job related materials, documentation, or elsewhere, the CQA Manager and <br /> CQA Monitors will first notify the foreman or superintendent supervising the work in <br /> question. The CQA Manager will then notify the construction manager. Suppliers of <br /> non-conforming products shall also be notified by the Contractor or the construction <br /> manager, if purchased by the owner directly. <br /> 2.4.2 Determining Extent of Non-Conformance <br /> Whenever a non-conformance is discovered or observed in the construction process, <br /> product,job-related materials, documentation, or elsewhere, the CQA organization will <br /> determine the extent of the non-conformance. The extent of the deficiency may be <br /> Vector Engineering, Inc. .143E Spring Hill Drive *Grass Valley, CA• (530)272-2448 <br /> -11- <br />
The URL can be used to link to this page
Your browser does not support the video tag.