My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CORRESPONDENCE_2008 (7/08 TO 12/08)
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
C
>
CORRAL HOLLOW
>
31130
>
4400 - Solid Waste Program
>
PR0440003
>
CORRESPONDENCE_2008 (7/08 TO 12/08)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/27/2021 2:39:24 PM
Creation date
4/20/2021 1:14:15 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
CORRESPONDENCE
FileName_PostFix
2008 (7/08 TO 12/08)
RECORD_ID
PR0440003
PE
4434
FACILITY_ID
FA0003698
FACILITY_NAME
CORRAL HOLLOW LANDFILL
STREET_NUMBER
31130
STREET_NAME
CORRAL HOLLOW
STREET_TYPE
RD
City
TRACY
Zip
95376
APN
25303010
CURRENT_STATUS
01
SITE_LOCATION
31130 CORRAL HOLLOW RD
P_LOCATION
99
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\cfield
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
212
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Construction Quality Assurance A) Plan Extension of Closure Cap <br /> Corral Hollow Sanitary Landfill August 21,2008 <br /> poor quality. During the progress of the work, density test locations will be plotted on <br /> a drawing by the CQA Monitor to verify that no significant areas are untested. The <br /> drawing will become part of the FCR. <br /> 3.4 Monitoring and Testing Requirements <br /> Earthwork components of the construction are summarized in Paragraph 3.1 of this <br /> section. Each component has specific construction requirements that must be <br /> monitored. The following sections list the monitoring requirements for each type of <br /> earthwork. <br /> 3.4.1 Clearing and Stripping <br /> ♦ Observe that erosion and sediment control silt fences, straw bale barriers, <br /> and other measures are securely in place prior to initiating clearing and <br /> stripping operations in any area. <br /> ♦ Observe that existing plant life designated to remain is protected against <br /> damage during construction. <br /> ♦ Observe that clearing and stripping in areas required for site access and <br /> execution of the work is complete. <br /> 3.4.2 Engineered Fill <br /> ♦ Observe that engineered fill is placed in accordance with the lines and <br /> grade shown on the construction drawings. <br /> ♦ Observe that material sources are suitable for compacted subgrade. <br /> ♦ Observe that fill material is compacted to 90% of the maximum dry <br /> density as determined by ASTM D1557. <br /> ♦ Perform tests at testing frequencies specified Table 3-1. <br /> 3.4.3 Liner Subgrade Preparation <br /> ♦ Observe that material source is suitable for the subgrade, is free of <br /> organic and oversized materials, and meets the grading requirements of <br /> the technical specifications. <br /> Vector Engineering, Inc. .143E Spring Hill Drive•Grass Valley, CA• (530) 272-2448 <br /> -19- <br />
The URL can be used to link to this page
Your browser does not support the video tag.