Laserfiche WebLink
M a • <br />VICINITY MAP <br />N.T.S. <br />SITE ADDRESS: <br />FORWARD LANDFILL INC. <br />9999 S. AUSTIN ROAD <br />MANTECA, CALIFORNIA 95336 - <br />LOCATION MAP <br />N.T.S. <br />INDEX- is - ­ . . <br />OF SHEETS <br />SHEET NO DESCRIPTION <br />1 TITLE SHEET <br />2 SITE PLAN/INDEX TO PLAN SHEET <br />3 WMU FU-06/FU-08 GAS SYSTEM PLAN <br />4 GAS SYSTEM DETAILS <br />5 GAS SYSTEM DETAILS <br />6 GAS SYSTEM DETAILS <br />G E N E R A L N 0 T E S: <br />1. THE CONTRACTOR SHALL COMPLY WITH ALLIED WASTE SERVICES - <br />2008 GENERAL, DRILLING, AND PIPELINE CONSTRUCTION BID <br />SPECIFICATIONS TERMS AND CONDITIONS, NOW REPUBLIC SERVICES. <br />2. DUE TO LANDFILL SETTLEMENT OR AREAS NEAR AN ACTIVE WASTE <br />FACE, THE GRADES SHOWN ON THESE PLANS MAY BE DIFFERENT <br />AT THE TIME OF CONSTRUCTION. IT IS THE CONTRACTORS'S <br />RESPONSIBILITY TO ADJUST PIPE ALIGNMENTS OR TRENCH DEPTHS, <br />AS DIRECTED BY THE ENGINEER OR COA REPRESENTATIVE TO MEET <br />THE ORIGINAL DESIGN INTENT. <br />3. THE CONTRACTOR SHALL NOT INTERFERE WITH EXISTING LANDFILL, <br />RECYCLING, OR TRANSFER STATION OPERATIONS. THE CONTRACTOR <br />SHALL BE RESPONSIBLE FOR MAINTAINING SAFE TRAFFIC PATTERNS <br />AND FLAGMEN. <br />4. THE CONTRACTOR SHALL PROVIDE 2 -INCH DIAMETER PIPE RISERS <br />ON TOP OF ALL BURIED PIPES TO COMPLETE AN AS -BUILT SURVEY <br />PIPE RISERS SHALL BE PLACED AT APPROXIMATELY 100 FEET ON <br />CENTER, AND AT ANGLE POINTS. <br />5. THE CONTRACTOR SHALL VERIFY ALL WELL DEPTHS WITH COA <br />PERSON PRIOR TO DRILLING. <br />6. THE DESIGN ENGINEER WILL PERFORM A FINAL INSPECTION UPON <br />SUBSTANTIAL COMPLETION OF CONSTRUCTION. THE CONTRACTOR <br />SHALL NOTIFY THE ENGINEER A MINIMUM OF 48 HOURS IN <br />ADVANCE TO COORDINATE THE FINAL INSPECTION WITH THE <br />CONTRACTOR. THE DESIGN ENGINEER OR COA PERSON WILL <br />PROVIDE A PUNCH LIST TO THE CONTRACTOR FOR ITEMS TO <br />CORRECT OR COMPLETE. THE CONTRACTOR SHALL NOTIFY THE <br />DESIGN ENGINEER IN WRITING IF ANY OF THE PUNCH LIST ITEMS <br />WILL NOT BE ADDRESSED. THE CONTRACTOR SHALL PROVIDE <br />JUSTIFICATION IN WRITING TO THE ENGINNER FOR NOT ADDRESSING <br />ANY OF THE PUNCH LIST ITEMS. <br />O <br />O <br />N <br />APRIL 2009 <br />PROJECT NO <br />2009.0016 <br />FILENAME i <br />01 _01456DB <br />SHEET NO <br />DRAWING NO <br />1 OF 6 a <br />N <br />F <br />Q <br />Z <br />W <br />J Z <br />W <br />OQ <br /><J <br />CQ W <br />LLa W <br />J < <br />(D _ <br />ow <br />®U <br />ccd <br />� w W <br />OC h <br />3 N ~ <br />H <br />a <br />d <br />OZ <br />U-Q <br />a <br />of <br />� <br />m <br />O <br />N <br />APRIL 2009 <br />PROJECT NO <br />2009.0016 <br />FILENAME i <br />01 _01456DB <br />SHEET NO <br />DRAWING NO <br />1 OF 6 a <br />