Laserfiche WebLink
L <br />E <br />CalRecycle <br />Disposal Facility Inspection Report (52) <br />.1r, .. County of San Joaquin <br />II 7 <br />i a � I � it I� �'� <br />39 -AA -0015 10/26/2012 LEA Periodic <br />irre 5 30AM Tim Ou specfiowiiTi ;. <br />illli"Illhu� <br />,I n; <br />.,.k w <br />tlIectei%r mal> <br />a�" f <br />II a r <br />d - .lull r. "� <br />Forward Landfill, Inc. Forward, Inc./Allied Waste North America <br />"= S 1{ <br />Fa iii <br />p l l 71 IK fi 7 ti <br />er ela <br />oc� <br />�a;.. <br />9999 S. Austin Road, Manteca 95336 <br />Michael Kith <br />Ruben Ramirez, Landfill Manager <br />THE ABOVE FACILITY WAS INSPECTED FOR COMPLIANCE WITH APPLICABLE SECTIONS OF THE DIVISION BD OF THE PUBLIC RESOURCES CODE (PRC) AND TITLE 14 AND TITLE 27 CALIFORNIA CODE OF REGULATIONS (CCR) <br />AM �ti0i1'S`i O JgrBv {�iQ[I n M r iPt. v.. Illlllllllh `' a ;w <br />`' II IIII+ s 4n's <br />.»,AN <br />p <br />I^ a <br />�;. ,,�, a. .. ��:.x.l,.»:aF.�;.s="...��,�'�rrts.,s"-,,..�' ;44'x. s:b ,. <br />x 20650 - Grading of Fill Surfaces <br />Comments: Ponding is observed at the top of landfill. <br />-Eliminate all areas of ponding. <br />-Covered fill surface shall be graded to promote lateral runoff and to prevent ponding. <br />Notes: <br />1. Cover comprised of TASW, tarps and soil. <br />2. One winter pad has been completed. Another winter pad is in construction. <br />3. There is a large pile of overs on site. According to the operator, the overs will be used for traction control during <br />inclement weather. Overs, after being used as traction control, shall be handled as waste. <br />4. The falconer is on site. According to the operator, the falconer has been on site since October 16, 2012. <br />5. The concentration of explosive gas in GP 28, 12 and 11 is 0% by volume. <br />6. All record are up to date. <br />7. According to the daily occurrence log, the Resource Recovery facility is closed once the total tonnage (landfill and RR <br />combined) reaches 4180 tons. <br />