Laserfiche WebLink
Scope of Work performed at Ins] Manteca Page I of 2 <br /> Scope of Work performed at Inshape Manteca <br /> AC Angelo Cassa <acassa@barnumcelillo.com> Reply all <br /> Q Thu 6/16 <br /> Elias Guzman <br /> You forwarded this message on 6/17/201610:18 AM <br /> Good Afternoon Elias <br /> Our work completed goes as follows for Inshape Manteca 1805 E. Yosemite Ave <br /> *** note from our Electrician*** <br /> Electrician met with Inshape maintenance director Elias and he directed me to remove switch for light in <br /> women's Spa room. In the womens room Spa, I removed the switch box, pipe, and extension box from <br /> the wall and sated off the electrical wires. I Installed a Goof ring and weather proof blank cover on the <br /> wall. <br /> Elias had me verify that there is no power to the light in the men's Spa room. I removed the light fixture <br /> and verified that there is NO power to the fixture. <br /> ********** Effective Monday May 23,2016 ********** <br /> The BCE Corporate Office Will Have A New Address. <br /> ********** 135Main Avenue, Sacramento, CA 95838 ********* <br /> ...._. - -..........._..._.--....------------------------------------ <br /> BCE's Office will be closed all day on Friday May 20, 2016 for the move. <br /> Phone numbers and Fax numbers will remain the same. <br /> Regards, <br /> Check out our online brochure! <br /> Angelo Cassa—Electrical Service <br /> Barnum& Celillo Electric, Inc. I www.bamumcclillo.com <br /> https://outlook.office.com/owa/?viewmodel=ReadMessageltem&ltemlD=AAMkADIwZT... 6/22/2016 <br />