Laserfiche WebLink
Underground Storage Tank <br /> Overfill Prevention Equipment Inspection Report <br /> 6 . OVERFILL PREVENTION EQUIPMENT DETAILS <br /> Tank ID one OPE per column T- 1 Diesel T- 1 Diesel <br /> Are both vent and tank riser piping F✓ Yes F✓ Yes ❑ Yes ❑ Yes <br /> secondarily contained ? ❑ No ❑ No ❑ No ❑ No <br /> OPE Model A1100 847391 - 107 <br /> What is the OPE response when activated ? Z Shut off ❑ Shut off ❑ Shut off ❑ Shut off <br /> (Check all that apply. ) Flow Flow Flow Flow <br /> ❑ Restricts ❑ Restricts ❑ Restricts ❑ Restricts <br /> Flow Flow Flow Flow <br /> ❑ Audible 0✓ Audible ❑ Audible ❑ Audible <br /> Alarm Alarm Alarm Alarm <br /> ❑ Visual Z✓ Visual ❑ Visual ❑ Visual <br /> Alarm Alarm Alarm Alarm <br /> Are flow restrictors installed on vent piping ❑ Yes ❑ Yes ❑ Yes ❑ Yes <br /> that may interfere with the OPE operation ? No No ❑ No ❑ No <br /> At what level in the tank is the OPE set to 81 . 75 77 . 5 <br /> activate ? (Inches from bottom of tank) <br /> What is the percent capacity of the tank at 94 90 <br /> which the OPE activates ? <br /> Is the OPE in proper operating condition to �✓ Yes Yes ❑ Yes ❑ Yes <br /> respond when the stored substance ❑ No ❑ No ❑ No ❑ No <br /> reaches the designated regulatory level? <br /> 7 . SUMMARY OF TESTING RESULTS 7771 <br /> OPE Inspection Results <br /> 0✓ Pass ❑✓ Pass ❑ Pass ❑ Pass <br /> ❑ Fail ❑ Fail ❑ Fail ❑ Fail <br /> 8 . COMMENTS <br /> Describe all results marked "Fail' and each proposed remedy. <br /> * Mark here if. <br /> ❑ Flow restrictors interfere with overfill prevention and equipment repairs required . <br /> Additional copies of this page may be attached. <br /> Attach tank chart(s), measurements, calculations, and In - Tank Setup report(s) <br /> Page 2 of 2 <br />