Laserfiche WebLink
UNDERGROUND STORAGE TANK <br /> OVERFILL PREVENTION EQUIPMENT INSPECTION REPORT FORM (Page 1 of 1 ) <br /> Type of Action ❑ Installation Inspection ❑ Repair Inspection lx 36 Month Inspection <br /> I . FACILITY INFORMATION <br /> CERS ID Date of overfill Prevention Equipment inspection <br /> 10141507 9/ 13/2018 <br /> Business Name (Same as Facility Name or DBA -Doing Business As) <br /> Frontier - Manteca <br /> Business Site Address City :::59p5336 <br /> Code <br /> 430 West Center St Manteca <br /> II . UNDERGROUND STORAGE TANK SERVICE TECHNICIAN INFORMATION <br /> Name of UST Service Technician Performing the Inspection (Print as shown on the /CC Certification.) Phone # <br /> Raul Ochoa ( 714 ) 434 -9995 <br /> Contractor / Tank Tester License # ICC Certification # ICC Certification Expiration Date <br /> 734854 J8029372 �_ 11 /13/2019 <br /> Overfill Prevention Equipment Inspection Training and Certifications (List applicable certifications.) <br /> EBW( FFS ) # 1011753710 Veeder Root #1334397 <br /> lilt OVERFILL PREVENTION EQUIPMENT INSPECTION INFORMATION <br /> Inspection Method ❑x Manufacturer Guidelines (Specify): Veeder ROOt <br /> Used : <br /> ® Industry Code or Engineering Standard (Specify) : PEI 1200 <br /> ❑ Engineered Method (Specify) : <br /> Attach the inspection procedures and all documentation required to determine the results. # of Attached Pages 8 <br /> TANK ID ; (By tank number, stored product, etc.) T1 Diesel T1 Diesel <br /> What is the tank inside diameter? (inches) 92 92 " <br /> Is the fill piping secondarily contained? El Yes ❑ No kE91 <br /> Yes ❑ No ❑ Yes ❑ No ❑ Yes ❑ No <br /> Is the vent piping secondarily contained? 0 Yes ❑ No Yes ❑ No ❑ Yes ❑ No ❑ Yes ❑ No <br /> Overfill Prevention Equipment Manufacturer(s) EBW Veeder Root <br /> What is the overfill prevention equipment response x❑ Shuts Off Flow rEl <br /> Shuts Off Flow ❑ Shuts Off Flow ❑ Shuts Off Flow <br /> when activated ? <br /> (Check all that apply.) ❑ Restricts Flow Restricts Flow ❑ Restricts Flow ❑ Restricts Flow <br /> ❑ AN Alarm (] AN Alarm ❑ AiV Alarm ❑ AN Alarm <br /> Are flow restrictors installed on vent piping ? ❑ Yes ❑ No ❑ Yes ❑ No ❑ Yes ❑ No ❑ Yes ❑ No <br /> At what level in the tank is the overfill prevention set „ <br /> to activate? (inches from bottom of tank.) 72 . 5 „ 77 <br /> What is the percent capacity of the tank at which the <br /> overfill prevention equipment activates? 78 % 90 % <br /> Is the overfill prevention in proper operating condition ® Yes ® Yes ❑ Yes ❑ Yes <br /> to respond when the substance reaches the <br /> appropriate level? ❑ No (Specify in V.) ❑ No (Specify in V) ❑ No (Specify in V.) ❑ No (Specify in V.) <br /> IV . SUMMARY OF INSPECTION RESULTS <br /> Overfill Prevention Inspection Results ® Pass ❑ Fail Q Pass ❑ Fail ❑ Pass ❑ Fail ❑ Pass ❑ Fail <br /> V. COMMENTS <br /> Any items marked "Fail` must be explained in this section. Any additional comments may also be provided here. <br /> Unable to remove 4 ” bung on ball float to inspect - seized on . <br /> VI. CERTIFICATION BY UST SERVICE TECHNICIAN CONDUCTING THIS INSPECTION <br /> I hereby certify thatthe overfill prevention equipmentwas inspected in accordancewith California Code of Regulations, Title 23 , <br /> Division 3 , Chapter 16 , Section 263 2 and all the information c ntained herein is accurate . <br /> jr <br /> UST Service Technician Signature <br /> If the facility has more components than this form accommodates, additional copies of this page may be attached. <br /> CERS = California Environmental Reporting System, ID = Identification, UST = Underground Storage Tank, ICC = International Code Council, AIV = Audible and Visual <br /> UN -109 www.unidoes. org 1 /1 - Rev. 06/14/18 <br /> i <br />